Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Productivity

Showing 135 of 1383

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest almost 3 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Allow grid view produced by a SQL script to interact with GeoPlan

Allow grid view produced by a SQL script to interact with GeoPlan so users can right click on SQL elements and zoom to/navigate to the selection on the GeoPlan.
Karen Chu 9 months ago in InfoWorks ICM / SQL 4 Gathering support

Set up runs more efficiently

Is there a matrix type tool in ICM that allows you to easily set up complicated run set ups? i.e. for this 1 Model Network, these runs with use these rainfall files, inflow files, WWG, etc are needed. Model Name Base Model Rainfall Inflow WWG...
Guest almost 6 years ago in InfoWorks ICM / Productivity / Simulations 0 Gathering support

Addition of error message

When creating a mesh for the 2D zone of Clip meshing, if a single infiltration zone straddles multiple 2D zones, the meshing process succeeds, but an E2225 message occurs in validation. I understand that this message occurs because the infiltratio...
Nami Ikarashi 9 months ago in InfoWorks ICM / Validation 0 For Review

2D worst case analysis

I would like to be able to analyse a number of simulations in terms of the worst flood depth per 2D mesh element. An integrated tool (along the lines of the already existing worst case grid output) would avoid the need to mess around in external GIS.
Iain Scott about 5 years ago in InfoWorks ICM / 2D Flooding / Hydrology / Productivity 1 Gathering support

Statistic Report Batch Processing

As a user the ability to 'schedule' statistical reports would be extremely useful. currently if i'm generating a spill report on several overflows for a 10yr TSR series this can take several hours. The process effectively locks the software and pr...
Jason Drake over 5 years ago in InfoWorks ICM / Productivity / Results 4 Gathering support

'Find and Replace Flags' tool on multiple networks.

As a large organisation with multiple users of InfoWorks ICM we have a set up with one masterdatabase and everyone using groups off this in order to keep all users on the same version. The downside is, that as users import previous models more fla...
Tom Walker over 5 years ago in InfoWorks ICM / Productivity 0 Gathering support

Generate new synthetic rainfall events using ICM exchange

No description provided
Guest over 5 years ago in InfoWorks ICM / API / Exchange / Rainfall 0 Gathering support

Use ruby to edit rainfall dialogue box

Exporting rainfall files to csv for manipulation creates details of the storm events themselves, we would like to be able to change the return periods, durations, multiplying factors shown in the rainfall dialogue editor instead.
Guest about 6 years ago in InfoWorks ICM / API / Exchange / Productivity / Rainfall 0 Gathering support

Adjust mesh locally without remeshing all

Adjust mesh locally without having to remesh the entire 2D zone.
Guest over 6 years ago in InfoWorks ICM / 2D Flooding / Productivity 2 Will not implement