Skip to Main Content
Autodesk
ADD A NEW IDEA

Hydraulics

Showing 102 of 1172

Inlet pump

We are mode and more incorporating surface water systems in our ICM models and part of those systems are inlet pumps that respond to the downstream levels instead of the upstream levels. Up until now, the only way to achieve this is by creating an...
Marcel Glasbergen over 1 year ago in InfoWorks ICM / Pumps / RTC 0 Gathering support

Time varying roughness values for rivers

As vegetation changes throughout the seasons, it would be great if we could also have time varying roughness patterns for river reaches.
Guest almost 5 years ago in InfoWorks ICM / Hydraulics / River Modeling 0 Gathering support

Pump Station Modelling

Infoworks ICM pump station modelling principle is very basic, adding a pump between two nodes is highly hypothetical. There is no way to add pump station head losses. I would like to suggest incorporating pump station modelling (for Rotodynamic pu...
Guest over 2 years ago in InfoWorks ICM / Hydraulics / Pumps 1 Gathering support

Conveyance on cross section lines

Provide cross section conveyance for each cross section
Guest about 5 years ago in InfoWorks ICM / Hydraulics / River Modeling 1 Gathering support

Slot Width field for 1D conduits

Could the Slot Width field be enabled for Conduit Type "Conduit" and results generated by the application of the numerical correction tool been stored there for greater clarity, thanks.
Giorgio Incelli almost 2 years ago in InfoWorks ICM / Hydraulics / Reporting 4 Gathering support

Minimum mesh element area

As we are aware that "Minimum mesh area" will be used in calculating the results. However, presently there is no specific function that directly displays the min mesh element area generated and its associated element ID. Validation needs to be per...
Guest about 1 year ago in InfoWorks ICM / Hydraulics 0 Gathering support

RTC - New time range to allow "between 2 dates" every year

In a similar way to the way "time repeat" works, can we have an RTC range that works between the same 2 dates every year. I have a catchment where the operating protocol works differently in the Bathing Season from the rest of the year. Having a w...
John Sourbutts about 5 years ago in InfoWorks ICM / RTC 0 Gathering support

snap river reach lines to cross sections

When creating river reach links the vertices should snap to cross sections so that vertices are only created on the cross-section lines (if vertices are to close on river reach objects you get meshing problems later on!) and is easier to follow th...
Guest about 1 year ago in InfoWorks ICM / River Modeling 0 Gathering support

Bank marker distinctions

It would be good if cross sections for rivers could be marked with left and right bank markers within the cross sections themselves.
Guest almost 5 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Infoworks - Pipe grade calculator

Pipe grade calculator between US and DS inverts, Ultimately having the ability to calculate downstream or upstream inverts over a long network based on a specified grade from either a DS or US invert level as a starting point.
Guest over 4 years ago in InfoWorks ICM / Hydraulics 1 Gathering support