Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks WS Pro

Showing 103 of 1250

Node Name Generation Default

In WS PRO it would be great to be able to set Node Name Generation format as a default for all networks in a database instead of having to enter it in every time I want to add nodes to a network
Guest about 5 years ago in InfoWorks WS Pro 0 Gathering support

Network Schematic for interaction with InfoWorks WS Pro models

I want to interact with my distribution network in a simplified schematic view, which displays DMA's and important control objects like pump stations and reservoirs. Software should be able to update the schematic based on changes to network conne...
Guest over 3 years ago in InfoWorks WS Pro 0 Gathering support

user defined boolean fields

Ability to create user defined boolean fields in order to incorporate fields within corporate GIS system
Richard Robinson about 5 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Set Area Codes- InfoWorks WS Pro

Add an "Exclude Selection List" option to the "set Area Codes" tool in IW WS Pro so that you can exclude selected links from the area code trace.
Guest about 5 years ago in InfoWorks WS Pro 1 Gathering support

In some types of elements the result of the simulation between consecutive time step are very different (oscillations).

Simulation results very differents between consecutive calculation times in series or cascade regulation elements; such as, pressure regulating valves (PRV), float valves (FLV), pumps, ...
Juan Carlos Ortega almost 2 years ago in InfoWorks WS Pro / Engine 2 Already exists

Insufficient channel modeling

Impossibility of simulating the operation of a "real" channel with different sections created by different cameras: derivation, shipones, ...
Juan Carlos Ortega almost 2 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Demand Diagram Timestep from Demand Area Calculation Page

When producing a Demand Diagram from the Demand Area Calculation Page, it would be useful to be able to choose the Demand Diagram Timestep (of course it can be les than the minimum Live Data timestep).
Paolo Boiardi 12 months ago in InfoWorks WS Pro / Other 0 For Review

Add new run groups and move existing runs to these

I’ve currently got one very big run group which should’ve really been split into several different ones. Is there a way to move around runs? In the explorer there’s only really the option to duplicate.
Guest almost 5 years ago in InfoWorks WS Pro 0 Gathering support

Max or Min Flow values should not depend on the pipe direction. i.e. the value being positive or negative depend on the pipe direction

Currently, if the flow direction through the pipe is opposite to the direction of the pipe drawn it shows as a negative flow value. So if the flow goes both direction during the run, smaller positive value shows as the maximum flow and larger nega...
Guest about 4 years ago in InfoWorks WS Pro / Other 0 Gathering support

To be able to graph refill/depletion rate and/or survival time on reservoirs and towers

in WS Pro
Guest over 4 years ago in InfoWorks WS Pro 1 Gathering support