Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Quick view graph docked in Results Properties Panel

When reviewing models, I want a quick view graph of any selected object in a docked location to review. The results Properties Panel could be a potential location. I want to be able to switch through to select which output is being displayed on th...
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Productivity 0 Gathering support

Add button for show/hide inactive elements.

I frequently turn the inactive elements on & off in InfoWater Pro. Right now, this requires multiple mouse clicks & is inefficient. A button added to the ribbon and/or Model Explorer would be ideal.
Guest almost 3 years ago in InfoWater Pro / Productivity 0 Gathering support

InfoAsset Manager - Add more reports to Ruby Exchange method

Currently Ruby supports the following generation of reports:The Reports which are supported and generated via this method are: Manhole Report - ['cams_manhole',nil] Manhole Survey Report - ['cams_manhole_survey',nil] CCTV Survey Report - ['cams_cc...
Anthony Andrews 11 months ago in Info360 Asset / Reporting 0 For Review

Sorting a conduit grid table based on upstream-downstream order (or vice-versa)

Help to sort a grid table (such as conduit) in order of upstream to downstream or vice-versa will be very helpful to modellers.
Guest about 3 years ago in InfoWorks ICM / Grids 0 Gathering support

Workflow that allows field inspectors to view CCTV recommendations directly in Info360 Asset and complete the CCTV directly in the product

After discussing with Martin and Martin about migrating workflows that are still occurring in Info360 Asset. After a Rehab Decision tree recommends that a pipe needs CCTV it would be useful to allow the field inspector to view the Rehab report wit...
Guest over 3 years ago in Info360 Asset / Inspection & Media Management Workflows / User access / roles / permissions 3 Under consideration

Overhaul to the Hyperlinks system to allow attached data to be transportable

ICM and Infoasset databases offer a system that allow hyperlinked documents to be connected to the database. Primarily this to allow survey, as laid and other background data to be available to the user and is a powerful function that if used corr...
Guest about 5 years ago in InfoWorks ICM / Sharing / Transportables 2 Gathering support

RTC - New time range to allow "between 2 dates" every year

In a similar way to the way "time repeat" works, can we have an RTC range that works between the same 2 dates every year. I have a catchment where the operating protocol works differently in the Bathing Season from the rest of the year. Having a w...
John Sourbutts almost 7 years ago in InfoWorks ICM / RTC 0 Gathering support

Removing missing GIS-layers

If a GIS-layer for a model is missing you cannot remove the reference to it because the layer isn't visible in the GIS layer control window. So you keep getting the error message each time you open the model. Why not make missing GIS-layers visibl...
Richard de Koning over 6 years ago in InfoWorks ICM / GIS Layers / Visualization 3 Under consideration

Pump Station Operation Narrative

Would like the ability to add a pump station narrative. For example, a station may have several pumps and varying set points, however those set points do not relate to a specific pump. The station may operate where once the first set point is reac...
Dave White almost 2 years ago in InfoWorks ICM / Pumps 1 Already exists

Capability to model water distribution network in ICM

Can the function of “ForceMain” in InfoWorks ICM be expanded so that ICM can model the water distribution network. Or the InfoWorks WS function be included in ICM. This is often a requirement when the recycled network and sewer network are to be m...
XJ Wang over 1 year ago in InfoWorks ICM / Hydraulics 2 Will not implement