Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1369 of 1369

RTC - New time range to allow "between 2 dates" every year

In a similar way to the way "time repeat" works, can we have an RTC range that works between the same 2 dates every year. I have a catchment where the operating protocol works differently in the Bathing Season from the rest of the year. Having a w...
John Sourbutts about 6 years ago in InfoWorks ICM / RTC 0 Gathering support

Adding Sediment Basin Design Function

It would be helpful if we can design sediment basins in infodrainage as another stormwater control and phase
Jenna Woyner over 1 year ago in InfoDrainage / Other 2 Will not implement

Apply RTC / observed values to Sluice Linear Structures

At the moment we cannot move sluice linear structures in 2D. We're wanting to model a river entirely in 2D but the river is subject to a series of barrages that would require control. Therefore it would be essential to apply RTC and observed setti...
Richard Body over 5 years ago in InfoWorks ICM / River Modeling / RTC 0 Gathering support

Export PDF of Quick Storage Estimate, QBAR calcs, volume calcs etc

Export PDF of Quick Storage Estimate, QBAR calcs, volume calcs etc
Guest about 2 years ago in InfoDrainage / Reporting 3 Gathering support

Units for catchment area: add km²

The choice of display units of the catchment area (under Tools--> Options--> Units) is now limited to ha or acre, which is not convenient for our river subcatchments. It would be useful to add the possibility of km².
Michael Huybrighs about 2 years ago in InfoWorks ICM / Other 0 Gathering support

Add a Brownfield Runoff tool under Preliminary Sizing > Calculators in the ribbon

To assist with initial site assessment, a brownfield runoff tool with printable reporting for the chosen rainfall events would be useful in the Preliminary sizing ribbon to allow analysis of brownfield and greenfield runoff rates from the same loc...
Guest almost 2 years ago in InfoDrainage / Hydrology 2 Already exists

As a user, I need to burn the 1D river into ground model, so the flooding extent inside the 1D river channel is shown accurately

HEC-RAS has a tool in RAS Mapper doing just that. https://www.kleinschmidtgroup.com/ras-post/including-channel-bathymetry-into-your-terrain/
Guest over 5 years ago in InfoWorks ICM / Terrain 2 Gathering support

Daytime and Night-time Agent Options

In my team, ICM simulations are spread out to run across all of our modelling PCs, via the coordinator. However, we are struggling to reach a compromise in setting the "Max threads total" value for some users - the balance between letting sims com...
Jason Kulsdom about 2 years ago in InfoWorks ICM / Performance 1 Will not implement

Using SWMM5 treatment equations at a node or link in ICM Networks

Users would like to use SWMM5 Buildup Washoff in ICM Networks AND the SWMM5 treatment equations at a node or link in the ICM St Venant solution. ICM SWMM networks have both options but for the purposes of using the powerful routing solution in I...
ROBERT DICKENSON over 4 years ago in InfoWorks ICM / Treatment / Water Quality 2 Gathering support

As a user I want to change the amount of decimals when applying Autolabels in Infoworks ICM

I want to change the amount of decimals when I apply Autolabels in Properties and Themes. Right now the default is three decimal places which I cannot edit.
Guest about 4 years ago in InfoWorks ICM / Labels 1 Gathering support