Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1423 of 1423

Allow Simulation Time and Reporting Time to set independently

Similar to the functionality available InfoWSWMM where you are able to define a start date and time for the simulation and a start date and time for results. This allows initial phases of the model simulation to be ignored by the results without n...
Guest almost 2 years ago in InfoWorks ICM / Simulations 2 Gathering support

Add ability to create custom channel as underdrain (not just pipe)

Currently, you can only chose a pipe or multiple pipes as the underdrain within various features (infiltration trench, dry swale etc.). It would be great if a custom channel (section) could be used so an infiltration trench could be used to model ...
Oliver Dodd over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Expanded use of the 'lining material' field

Pipes that are lined have to be updated in the GIS. Info360 Asset provides 'lining material' and 'lining type' fields. I think it would be beneficial to utilize this field in the risk analysis when assessing the 'pipe material' component to look a...
Martha Nunez almost 2 years ago in Info360 Asset / Asset Deterioration Modeling 0 Gathering support

GPU for 2D Erosion Deposition Model

The 2D erosion-deposition model can only be simulated on the CPU. For 2D rain-on-mesh models with GPU simulation times spanning hours, it becomes impractical to integrate the 2D erosion-deposition model, as CPU simulation times would extend into d...
Daniel Fensom over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Provide min_time_step on 2D results mesh

In an effort to speed simulations up - it would be helpful to know what mesh elements are slowing down a 2D simulation. A single Job Progress value is insufficient to chase down which of these 200K mesh elements is slowing down the model.
Guest over 2 years ago in InfoWorks ICM / Results 1 Gathering support

Apply RTC / observed values to Sluice Linear Structures

At the moment we cannot move sluice linear structures in 2D. We're wanting to model a river entirely in 2D but the river is subject to a series of barrages that would require control. Therefore it would be essential to apply RTC and observed setti...
Richard Body almost 6 years ago in InfoWorks ICM / River Modeling / RTC 0 Gathering support

Workflow Manager

A tool where I can assign tasks to users to add information to analytics, workspaces, alerts, etc... that will link to each feature in the order it needs to be performed, and then send completed product for review and approval to another user.
Guest almost 3 years ago in Info360 Insight / General 0 Gathering support

Point and line source objects for flooding 2D Analysis

I would like to assess the site and drainage network for flooding from a particular source that does not originate from a surcharged network. ICM has both of these objects available. The idea would be to connect a base flow, hydrograph or catchmen...
matthew.piggott 11 months ago in InfoDrainage / 2D Flooding 0 For Review

As a user, I need to burn the 1D river into ground model, so the flooding extent inside the 1D river channel is shown accurately

HEC-RAS has a tool in RAS Mapper doing just that. https://www.kleinschmidtgroup.com/ras-post/including-channel-bathymetry-into-your-terrain/
Guest over 5 years ago in InfoWorks ICM / Terrain 2 Gathering support

Right click for graphs

I am a Bentley WaterGEMS user recently transitioning to InfoWorks WS Pro. While WaterGEMS has got its fair share of problems, the interface is very user friendly. For example: after you run the simulation, the graphs can be viewed just by a single...
Guest over 2 years ago in InfoWorks WS Pro / Productivity 1 Gathering support