Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Scenarios should stop tracking differences when values return to default

Our organisation is using scenarios to manage alternate model configurations like Peak Day, Average Day, etc. in our main working model. Over time some field values will change from the Base value, and then change back (or the other way around, wh...
Dave Watts about 1 year ago in InfoWorks WS Pro / Other 1 Under consideration

Catchment area in different colour

currently the catchment area demarcation gives only a common colour at all area. we need to allow catchment area in different colors to demark Paved, unpaved, Road in details while we represent the details to client
Guest over 2 years ago in InfoDrainage / Visualization 1 Gathering support

Addition of error message

When creating a mesh for the 2D zone of Clip meshing, if a single infiltration zone straddles multiple 2D zones, the meshing process succeeds, but an E2225 message occurs in validation. I understand that this message occurs because the infiltratio...
Nami Ikarashi over 1 year ago in InfoWorks ICM / Validation 1 Under consideration

Displaying GIS layers above network objects

In ICM, files added through the GIS layer control dialog are displayed below the objects. Could you add a feature to display them above the objects? For example, when representing roads with shp files, displaying these backgrounds above the object...
Nami Ikarashi over 1 year ago in InfoWorks ICM / GIS Layers 2 Gathering support

HEC-22 Inlet reporting

The "Export HEC-22 Result to Excel" button in the calculator only includes results. Looking at flexible reporting, the HEC-22 data is only input, so I then have to use the results data from the calculator and the input data from flexible reporting...
Guest over 1 year ago in InfoDrainage / Hydraulics 1 Under consideration

Time of Concentration (TR-55) Calculator

Although the software has a TR-55 calculator for time of concentration, it doesn't work properly and also needs additional options added. Currently it isn't functional, because the software doesn't allow you to use only 1 or 2 of the 3 flow condit...
Nick Brewer over 2 years ago in InfoDrainage / Hydrology 2 For Review

Option to relate split pipe ID to original ID

When splitting pipes, the new ID for the resulting pipe is based on the ID and Description tab in the model's Preferences. Instead of going with those settings, it would be nice to have an option to enable that would instead take the original ID a...
Kim Solberg over 2 years ago in InfoWater Pro / Other / Productivity 0 Gathering support

Update Database command accessibility

I recommend reviewing the placement, accessibility and prompts to ‘Update a database’ . The onset of backwards compatibility within software versions is resulting in unintended database updates. It would be beneficial to explore ways to make the ‘...
Andy Power 9 months ago in InfoWorks ICM / Workgroup 1 Will not implement

Request for improved ID handling when importing xpswmm models

I would like to request an enhancement regarding an issue that occurs when importing xpswmm models into ICM. Normally in ICM, when land use and runoff surface settings are shared across multiple subcatchments, a single land use ID is used for all ...
Nami Ikarashi about 1 year ago in InfoWorks ICM / Import data 3 Already exists

Point and line source objects for flooding 2D Analysis

I would like to assess the site and drainage network for flooding from a particular source that does not originate from a surcharged network. ICM has both of these objects available. The idea would be to connect a base flow, hydrograph or catchmen...
matthew.piggott over 1 year ago in InfoDrainage / 2D Flooding 0 For Review