Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks WS Pro

Upstream and Downstream Trace Icons are misleading

Minor annoyance here and possible solution- can you change the icons for the upstream and downstream trace to actually be meaningful? at the moment both icons represent downstream and upstream trace at the same time and it doesn't make sense
Daniel Alexander over 1 year ago in InfoWorks WS Pro / Other 1 Gathering support

easier import/update for demand diagram and demand scaling

I want to be able to import demand categories from csv. The format the ddg-file has to be in to be able to import it is very complex. Creating or updating Demand Diagrams can take up a lot of time
Caroline Heylen 9 months ago in InfoWorks WS Pro / Productivity 1 For Review

result grid for customer points

Currently results for customer point minimum and maximum pressures can be retrieved using various steps.
Guest 9 months ago in InfoWorks WS Pro / Automation 0 For Review

Scenarios should stop tracking differences when values return to default

Our organisation is using scenarios to manage alternate model configurations like Peak Day, Average Day, etc. in our main working model. Over time some field values will change from the Base value, and then change back (or the other way around, wh...
Dave Watts about 1 year ago in InfoWorks WS Pro / Other 1 Under consideration

Re-order database tree items and scenarios

It would be useful if all tree items like runs, selection lists, model groups etc could all be re-ordered and grouped/un-grouped as necessary. I would also like this extended to scenarios as well. This would allow for significantly improved organi...
Cale Maclean 5 months ago in InfoWorks WS Pro / Productivity 0 For Review

Rename, re-size and group open window tabs

Much like modern functionality of browsers - the ability to resize tabs, rename them (names become far too long by default) and group them together would be very beneficial when looking at multiple sets of results (ie multiple graphs and replay re...
Cale Maclean 5 months ago in InfoWorks WS Pro / Productivity 0 For Review

Toggle to sync view between Long Section and GeoPlan

I want an option to synchronize the view between the Long section and the Geoplan. When turned on, the geoplan will automatically zoom to the current visible set of links in my long section. If I zoom in/out on either the map or long section, the ...
Nathan Gerdts about 3 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Enable GMR to manipulate Demand Scaling

I want to explore model sensitivity to multiple different demand growth scenarios.Currently GMR enables direct editing of demand at nodes, but this replaces the current node demand and doesn't scale well for system-wide assessments.I want to apply...
Nathan Gerdts 11 months ago in InfoWorks WS Pro / Engine 0 For Review

Support SQLite / GeoPackage Data Formats in ODIC

It would be useful to import and export from structured, typed data in a container format - preferable SQLite and/or GeoPackage. The current import/export options are either untyped (e.g. CSV), require a database (Oracle, SQL Server), are SHP f...
Dave Watts over 1 year ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Expand Primary Key Fields to Support UUIDs

It would be helpful to use UUIDs as primary/secondary key fields for row objects for data exchange with other GIS databases. It could also be a better way of generating new IDs than the default approach of sequential numbers, which cause problems ...
Dave Watts over 1 year ago in InfoWorks WS Pro / Data Exchange 1 Gathering support