Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks ICM

Showing 510 of 1227

Enhance import/export of SWMM models for ICM platform

Enhance model import from SWMM5 INP files to include a few of the Open Data Import Center /Open Data Export Center options: • Only update existing records • Ignore existing objects • Overwrite, Merge, etc. • Export Selection only Ultimately we wan...
Guest over 4 years ago in InfoWorks ICM / Export Data / Import data / InfoWorks / SWMM 1 Gathering support

Scenario assigned 'official' ID numbers within software

I would like for scenario names to be prefixed with a built-in ID number, in the same way that model commits have official version numbers, and wastewater and trade waste profiles have ID numbers. ICM clearly tracks ID numbers behind the scenes, s...
Jason Kulsdom over 2 years ago in InfoWorks ICM / Scenario 1 Gathering support

Enable remote simulations with state files without local agent being active

When running (very) long time series, we often split up simulations in shorter blocks and link them via final/initial states (mainly to prevent total loss of results in case something happens near the end of the simulation, and to make results mor...
Guest over 4 years ago in InfoWorks ICM / Performance / Productivity / Simulations 0 Gathering support

compatibility with WMTS servers

Compatibility with WMTS servers for the GIS layer control would be very urgent. Right now a lot of data is only to project from WMTS servers.
Richard Wilbrink over 2 years ago in InfoWorks ICM / GIS Layers / Import data 0 Gathering support

Collapsing walls identified in the log file

Can we have the status of base linear structures included in the log file? I have a large model where I have lots of these and I need to interrogate each one in turn. It would be much easier if the log file (or, better still, a grid view) showed t...
Richard Body over 4 years ago in InfoWorks ICM / Reporting / Visualization 0 Gathering support

Automatically add network details when copying a network from commit history

When a version of a network is copied via the commit history dialog box, the standard commit detail generated is "created from copy". Could this be extended by automatically inserting the original network name and version number ? It would help a ...
Guest over 4 years ago in InfoWorks ICM / Network / Productivity 0 Gathering support

Active/Inactive Network Elements

Ability to activate and inactivate model elements in InfoWorks as one can do in InfoSWMM.
Michael Wetterau over 2 years ago in InfoWorks ICM / Productivity 0 Gathering support

Add Data Sets to InfoWorks

Add Data Sets to InfoWorks as one can do in InfoSWMM. Helpful when clients want to model alternatives scenarios and make last minute changes.
Michael Wetterau over 2 years ago in InfoWorks ICM / Productivity 0 Gathering support

Log locations that most often cause timestep halving during a simulation

The "Job Progress" window provides information of the location that cause multiple iterations or reduced time-steps in the 1D model, under the headings "Link fail H", "Link fail Q", "Node fail". This is useful for diagnosing potential locations of...
Manu Ward about 1 year ago in InfoWorks ICM / Results 2 Already exists

Merge radar and rain gauge data for accurate spatial rainfall assignment

I would like to use radar rainfall like NEXRAD and spatially correct it to my rain gauge network locally before applying the rainfall in my model.
Guest almost 5 years ago in InfoWorks ICM / Events / Rainfall 0 Gathering support