Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 209

Variable 2D roughness at low depths

When applying direct rainfall onto 2D zones traditional roughness values do not typically apply, especially where the depths of water on the mesh element are very small. Often the workaround is to apply much higher roughness values in order to 'sl...
Richard Body almost 5 years ago in InfoWorks ICM 0 Launched

Let me see the attribute table for my spatial data

When I upload spatial data I want to be able to view it's attributes in the map grid like I can the asset data, but the system doesn't let me. This would be helpful for me to see at-a-glance, for example, what all of my current PRV settings are wi...
Pete Mcintosh 11 months ago in Info360 Asset / Asset / Spatial Data Import 1 Launched

Multi-thread parallel simulations

As a user I want to take advantage of multi-threaded CPUs to accelerate simulation intensive procedures (e.g. design calibration)
Guest over 5 years ago in InfoWater Pro / Engine / Productivity 3 Launched

As a user, I would like an automated method to allocate demands from meter points through lateral polyline to pipelines.

I need a way to allocate demand from a meter (point meter) to the pipe (polyline) based on the lateral connection (polyline) at end points. Keep in mind: The features might not snap nor connect to pipes
Bill Maggiore almost 5 years ago in InfoWater Pro 0 Launched

Formatting of Reports

The output reports from Infordrainage, are not set to fit the page and as such, there is a lot of "white space" left on the outputs. At present, there are no formatting options to change this. It makes the drainage report look a bit untidy.
Guest over 2 years ago in InfoDrainage 3 Launched

Run Statistical Templates / Compose Statistical Reports against results in the cloud - ie no local download needed

This would help with productivity, ie to not 'lock' the client application with one stats analysis at a time; would help with results management (local disk space); would be used by anyone doing CSO stats in the UK (eg every hydraulic modeller for...
Saul Bradford 12 months ago in InfoWorks ICM / Statistics 1 Launched

Know which master database refers to a working/results folder

Create a means to know which master database is connected to a working / results folder. i.e. to go from the long name of the working / results folder to the ICM master database. A simple text file within the folder could give the name of the mast...
Lizzie about 3 years ago in InfoWorks ICM / Other 2 Launched

Water Modeling Integrations (InfoWater Pro & WS Pro)

Simulation results from InfoWater Pro are available for use in risk and rehab models in Info360 Asset.
Mike Maylone over 2 years ago in Info360 Asset / Other 0 Launched

Integration with InfoWorks ICM - Risk

Modeling data for risk analysis
Martha Nunez over 1 year ago in Info360 Asset / Other 3 Launched

InfoDrainage - Re-Ordering Tables

Please can you add an ability to manually adjust the order of Junctions and Connections as the tables quickly become difficult to follow. The automatic re-ordering seems to reset as soon as you make any changes!
Guest over 2 years ago in InfoDrainage 2 Launched