Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoDrainage

Showing 215 of 1327

Time of Concentration (TR-55) Calculator

Although the software has a TR-55 calculator for time of concentration, it doesn't work properly and also needs additional options added. Currently it isn't functional, because the software doesn't allow you to use only 1 or 2 of the 3 flow condit...
Nick Brewer 11 months ago in InfoDrainage / Hydrology 1 For Review

Drop down of flow paths in section view

It would be very handy if, in the long section view of flow path, there is a dropdown with the available flow paths in that phase, as happens on other table-like dialogs. This would not require the user to close the long section view to get to the...
Guest 3 months ago in InfoDrainage / Visualization 1 For Review

True Ground Profile on Long Section Exports

It would be very useful if there was a way for the true ground profile to also be exported on long sections. Currently, when exporting long sections from microdrainage, the true ground levels are only shown at manhole locations and a straight line...
Guest over 2 years ago in InfoDrainage 2 Already exists

TR-20 Runoff Generation

Can ID incorporate this methodology? MA department of Env Protection will be requiring this for their calculations.
Jess Ewing about 1 year ago in InfoDrainage / Hydrology 1 Gathering support

More Customizable Plot Plan view

Make the Plot Plan function more readable, it is difficult to get a whole design on one sheet especially with the header table in the way and not allowing for customization.
Jenna Woyner over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Catchment area in different colour

currently the catchment area demarcation gives only a common colour at all area. we need to allow catchment area in different colors to demark Paved, unpaved, Road in details while we represent the details to client
Guest over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Channel library similar to pipe library

It is essential to add / create library for rectangular channels with different width such as 300mm, 450mm width. Currently infodrainage choose a default 600mm wide rectangular channel. It is essential to have options to set minimum width other th...
Guest over 1 year ago in InfoDrainage / Hydraulics 1 Gathering support

Manhole Schedule Numbering

For MH tables and report outputs, it would be good to have an option to report chronologically, e.g. 1-30. I understand it numbers them on the first Manhole built in the model however I think it would make more sense to go from shallowest to deep...
Guest over 2 years ago in InfoDrainage 3 Already exists

InfoDrainage - level bench in basin/pond configuration

The sizing calculator in the pond build pop-up enables one side lpe only. There are now LLFAs that require level benck of at aleast 1.5 m width after 0.6 m depth in a basin. It is currently not possible to use your calculator to establish such bas...
Guest over 2 years ago in InfoDrainage 2 Gathering support

I want a Gully Space calculations tool in InfoDrainage

InfoDrainage - want to do Gully space calculations or assess capacity of different gullies. can you add the gully design tool to InfoDrainage?
Guest over 2 years ago in InfoDrainage 1 Under consideration