Attribute table copy function

A better copy function between networks might be usefull: e.g. Also copy the 'link head discharge' or 'conduit shape geometry' tables when copying a link from one network to an other. Or at least a popup allowing you to select which lists to copy ...
Guest about 5 years ago in InfoWorks ICM / Productivity 0 Gathering support

Drain nodes connected to 2d domain representing road gullies to 1D pipe network without digitised connection

Often datasets of road gullies are only in point format and lack details on the connections to the surface water sewer network. A function to allow 1D nodes representing road gullies (which are are connected to the 2D domain with a head discharge ...
Guest almost 2 years ago in InfoWorks ICM / Inlets 0 Gathering support

Update downstream pipes

It would be useful to have an option to upsize downstream pipes automatically (just like microdrainage). For example, if i increase pipe size the corresponding downstream pipes should upsize accordingly so not to cause a restriction. At the minute...
Guest over 2 years ago in InfoDrainage / Productivity 2 Already exists

Use consistent terminology in the Fireflow Results Report

The Fireflow Results Report uses the following terms for what I believe are the same thing: Total Demand, Design Flow, & Fire Demand. If these are not the same in the context of this report then explain their differences. Also, the term "Hydra...
Guest 11 months ago in InfoWater Pro / Other 0 For Review

InfoAsset Mobile: Make calculations using blob field values

Within InfoAsset Mobile, I would like to be able to run queries and calculations using data which is within a blob field - so calculate values along a blob data row (e.g. columns A + B will = C), as well as calculate values from the bob into a fie...
Guest over 4 years ago in Other Product Ideas / Asset Management 1 For Review

Control units precision in long plots and grid plots

it would be nice to be able to control unit precision such as volume in m3 to a whole number when reported volume is in the 400000 m3. we do not need to see 4 digits past the decimal!!
John Krpan almost 2 years ago in InfoWorks ICM / Long Section / Profile 0 Gathering support

Allow copying of model object Sub-themes to Theme objects in the db tree

The ability to use the 'copy sub-theme' functionality from the Properties & Themes dialog to copy sub-themes to Theme objects that are saved in the database tree.
Guest about 6 years ago in InfoWorks WS Pro 0 Gathering support

Exclude specific elements from Numbering Scheme (flow paths, manholes, simple junctions, etc).

Be able to have only manholes in the manhole schedule, without any missing manhole numbers. Junctions can be named separately and not included. Enable large sites with multiple areas to have their different areas named a different way easier.
Guest almost 2 years ago in InfoDrainage / Auditing / Reviewing 2 Gathering support

Pipe incident data flow through to Asset for risk and rehab analysis

It would be useful if pipe failures relating to pipe leaks and bursts could be fed through to Info360 Asset for use in risk and rehab determinations
Brad Thompson over 2 years ago in Info360 Insight / Asset 0 Under consideration

GIS Gateway default Value

While updating the model from GIS and importing new objects, I want a user-defined Default value column for each field. If the source GIS is missing values, or there is no appropriate field to populate, fill in the model attribute using the defaul...
Nathan Gerdts almost 2 years ago in InfoWater Pro / Data Exchange 1 Gathering support