Provide a "Remove elements from domain" option within DB Editor, Edit Domain Attributes, and tabular results report

I would like to be able to remove items from the domain as I review them within DB Editor, Edit Domain Attributes, and tabular results report tables, similar to the "Append to Domain" available when "right clicking" on an item in DB Editor.
Chris Keil 5 months ago in InfoWater Pro / Productivity 1 Gathering support

Add ability to see all pipes in Network Design Report

It is not possible to view the details / preliminary results of all the connections in the Network Design Report (each flow path needs to be selected in turn). This can be awkward for large networks.
Matthew Johnson over 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Optimising Parts Mapping

The parts mapping from Civil 3D to InfoDrainage can be quite tedious. Could we not have something like a vista table to view all connections and junctions in one table to see all parts at once and be able to change e.g a whole row to a connection ...
Guest about 1 month ago in InfoDrainage / Civil3D Integration 0 For Review

normalize demand diagram from live data link

i want be able to normalize the demand diagram profiles when linked to a live link. At this moment I can import water balances , but the 'normalize Daily Values' Button is greyed out. It would be useful to be able to use this
Caroline Heylen about 1 month ago in InfoWorks WS Pro / Telemetry 0 For Review

Depths, Velocity and Hazard raster creation

it would be great if ICM could include a tool to create multiple rasters. I understand that generating the initial 2D shapefile and processing the results to find the maximum values is the hard task. But once this shapefile is ready, converting it...
Gamaleldin Essam 11 months ago in InfoWorks ICM / Sharing 1 Under consideration

Set gradient and/or pipe size of multiple parts within a single flow path in one operation.

In some instances we need to change the gradient or pipe size of an entire flow path. It would be helpful if this could be done in one operation rather than each part individually. Any branch connections could also update to align unless locked.
Guest over 1 year ago in InfoDrainage / Productivity 2 Will not implement

Variable depth for open channels and swales

One limitation we are running into is the inability to model varying depths within swales in InfoDrainage. Often open channels will run along road corridors for example where the crest either remains at a similar elevation while the depth changes....
Guest almost 3 years ago in InfoDrainage / Visualization 3 In progress

Pump Symbol Direction in Long Section

When generating a long section, the pump symbol in the strip plan always points left to right (all "directional" link symbols point left to right). It would be great to have them display in the correct direction, i.e. flip the symbol if the long s...
Daniel Alexander about 1 month ago in InfoWorks WS Pro / Other 1 Under consideration

Add a “Restore Version as Latest” Function in InfoWorks WS Pro

In InfoWorks WS Pro, it is currently not possible to restore an earlier network version and promote it as the latest version. If a mistake is made in a newer version (e.g., Version 194), the only available workaround is to copy or branch from the ...
Guest about 1 month ago in InfoWorks WS Pro / Productivity 0 For Review

Query “System Demand” results for “totalized” volume

It is universally understood that “the area under the curve” approximates the total volume of water for each of the “System Demand” output graphs in InfoWater Pro. Although a “Totalizer” can be applied to a pipe, it is not currently possible to qu...
Michael Kane 7 months ago in InfoWater Pro / Productivity 1 Gathering support