Skip to Main Content
Autodesk
Status Gathering support
Product InfoWater Pro
Categories Productivity
Created by Michael Kane
Created on Sep 19, 2025

Query “System Demand” results for “totalized” volume

It is universally understood that “the area under the curve” approximates the total volume of water for each of the “System Demand” output graphs in InfoWater Pro. Although a “Totalizer” can be applied to a pipe, it is not currently possible to query the “System Demand” output for totalized volume. While a totalized volume can be approximated by hand using the System Demand Report, this would be unnecessary (and likely more accurate) if there were an option to have IWP tabulate Cumulative Volume for each time step (similar in function to a pipe totalizer), especially for Pipe Leakage.

  • Attach files
  • Robert Dickinson
    Sep 22, 2025

    This should be added just to see the word “totalized”