Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 26 of 1442

InfoAsset Online - Grid Sorting

When a selection of schedulable objects is made they are not ordered. They should be ordered preferably by the date completeled, with the latest survey at the very top of the grid.
Idris Nujjoo 10 months ago in Info360 Asset / General 3 Gathering support

weighted roughness value according to the % of rougness zone within the 2D element

We have more and more detailed data and detailed models. This results into very detailed land use polygons then very detailed roughness zones. It means that a 2D element can contain several roughness zones. Intead of using the barycenter of the 2D...
Armonie COSSALTER 5 months ago in InfoWorks ICM / 2D Flooding 1 For Review

Use tracers for water on mesh elements

Our clients are more and more trying to figure out if damage to a property is caused by water from the public area (which is the responsibility of the client) or from private areas (which is not). When rainfall on mesh can pick up a tracer (eg. fr...
Marcel Glasbergen almost 4 years ago in InfoWorks ICM / 2D Flooding / Visualization / Water Quality 1 Gathering support

2D worst case analysis

I would like to be able to analyse a number of simulations in terms of the worst flood depth per 2D mesh element. An integrated tool (along the lines of the already existing worst case grid output) would avoid the need to mess around in external GIS.
Iain Scott about 5 years ago in InfoWorks ICM / 2D Flooding / Hydrology / Productivity 1 Gathering support

User owned templates that can be shared across projects

With this feature, a user could save an already created risk or rehab analysis as template that they could utilize in other projects. This would save consultants and resellers a large amount of time from conducting repetitive processes.
Guest over 1 year ago in Info360 Asset / Product workflows 1 On roadmap

Flooding extents boundary

Would like the ability to export the maximum 2D flooded boundary so I can show this in Civil 3D.
Guest about 1 year ago in InfoDrainage / 2D Flooding 2 Already exists

Adjust mesh locally without remeshing all

Adjust mesh locally without having to remesh the entire 2D zone.
Guest over 6 years ago in InfoWorks ICM / 2D Flooding / Productivity 2 Will not implement

InfoWorks ICM needs to number 2D mesh elements using a Hexagon framework or similiar method if this is stormwater design tool of the future

A remesh in a scenario will move mesh element IDs all over the place rendering a new channel useless for design purposes. The maximum wsel equations makes the mesh look like a kalediscope. Uber uses Hexagons to subdivide the world, and I am sugges...
Guest over 1 year ago in InfoWorks ICM / 2D Flooding 3 Gathering support

Workflow that allows field inspectors to view CCTV recommendations directly in Info360 Asset and complete the CCTV directly in the product

After discussing with Martin and Martin about migrating workflows that are still occurring in Info360 Asset. After a Rehab Decision tree recommends that a pipe needs CCTV it would be useful to allow the field inspector to view the Rehab report wit...
Guest about 3 years ago in Info360 Asset / Inspection & Media Management Workflows / User access / roles / permissions 3 Under consideration

Point and line source objects for flooding 2D Analysis

I would like to assess the site and drainage network for flooding from a particular source that does not originate from a surcharged network. ICM has both of these objects available. The idea would be to connect a base flow, hydrograph or catchmen...
matthew.piggott about 1 year ago in InfoDrainage / 2D Flooding 0 For Review