Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 726

Export run results to csv: timestep options

When exporting run results to csv, it would be useful to select a timeframe you wish to export (excluding for instance the initial conditions that haven't settled into a level that makes sense). Also exporting at a different timestep than the one ...
Guest over 2 years ago in InfoWorks ICM / Export Data / Results 0 Gathering support

Add an option to automatically Refresh All graphs in the Report Manager after a new run.

Currently when you complete a new run you have to remember to hit Refresh All in the Report Manager to see latest results. The use-case for viewing old run results is rare, so having an option to automatically refresh all graphs and tables would b...
Grant Clemens about 1 year ago in InfoWater Pro / Productivity 0 Gathering support

Set up runs more efficiently

Is there a matrix type tool in ICM that allows you to easily set up complicated run set ups? i.e. for this 1 Model Network, these runs with use these rainfall files, inflow files, WWG, etc are needed. Model Name Base Model Rainfall Inflow WWG...
Guest over 5 years ago in InfoWorks ICM / Productivity / Simulations 0 Gathering support

Support for defect specific rehabilitation methods and costs

In many cases, the rehabilitation of a pipe is done in a localized manner such as it is the case for point defects like breaks, holes, etc. A pipe might need one, or multiple of these localized repairs. When analyzing the cost and planning for rep...
Martha Nunez about 2 years ago in Info360 Asset / Query types / Capabilities 1 Gathering support

Statistic Report Batch Processing

As a user the ability to 'schedule' statistical reports would be extremely useful. currently if i'm generating a spill report on several overflows for a 10yr TSR series this can take several hours. The process effectively locks the software and pr...
Jason Drake about 5 years ago in InfoWorks ICM / Productivity / Results 4 Gathering support

2D worst case analysis

I would like to be able to analyse a number of simulations in terms of the worst flood depth per 2D mesh element. An integrated tool (along the lines of the already existing worst case grid output) would avoid the need to mess around in external GIS.
Iain Scott over 4 years ago in InfoWorks ICM / 2D Flooding / Hydrology / Productivity 1 Gathering support

Add US and DS HGLs for links

Currently ICM link results report the US and DS total head values. As a user, I'd like to see the HGL at the US and DS locations consistent with the node results. This would be useful on graphs and long sections.
Guest over 2 years ago in InfoWorks ICM / Long Section / Profile 0 Gathering support

RTC range: give the choice to include or exclude the minimum or maximum value

Make it possible to define 'greater than (GT)' or 'greater or equal (GE)' in a range in RTC.
Guest over 2 years ago in InfoWorks ICM / RTC 0 Gathering support

RTC rules: order alphabetically

When copying rules, they appear in seemingly random order. When you have a lot of rules it can be very difficult to have an overview
Guest over 2 years ago in InfoWorks ICM / RTC 0 Gathering support

ICM UPM tool - running all impact durations at the same time

For any CSO assessment we do, we always have to compare standards for all impact durations (1hr, 6hr, 24hr). We’ve found setting up the tool the exact same way 3 separate times, only selecting a different impact duration, very slow and inefficient...
Guest almost 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support