Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 117

Create a ground model using LIDAR data in a .tif format

LIDAR data is now typically stored in a .tif format as opposed to .asc, and so it would be useful to be able to create a ground model in Infoworks WS Pro using .tif data.
Guest about 4 years ago in InfoWorks WS Pro / Data Exchange 0 Under consideration

Pipe incident data flow through to Asset for risk and rehab analysis

It would be useful if pipe failures relating to pipe leaks and bursts could be fed through to Info360 Asset for use in risk and rehab determinations
Brad Thompson almost 2 years ago in Info360 Insight / Asset 0 Under consideration

Improved tutorial for setting up a network

InfoDrainage - i am just trailing software and using the metric tutorial. i do not like loading in items from MicroDrainage or AutoCAD and was hoping the tutorial would show how to quickly setup a highway drainage system with pipes/manholes/gullie...
Guest over 2 years ago in InfoDrainage 1 Under consideration

Flow direction arrows default symbology

By default, flow direction arrows show up as blue for forward flow, red for backwards flow. This is a pointless distinction because for distribution systems, "forwards" or "backwards" depends on the direction the pipe was initially digitized and h...
Colin Ricks almost 2 years ago in InfoWater Pro / Productivity 0 Under consideration

Auto themes

When themes are set and the upper and lower values for a set of themes have been defined, the auto themes button starts with the non linear interpolation between the minimum and maximum value, it would be great if this interpolation could initiall...
Guest about 5 years ago in InfoWorks ICM / Visualization 0 Under consideration

InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

Allow the Analysis Run to recalculate precedent Analyses before running itself. I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not neces...
Bradley Nissley about 5 years ago in Other Product Ideas / Asset Management 0 Under consideration

Import logs for CCTV when an inspection does not match to a pipe.

This is useful for many reasons related to data management but the following used case came up when talking to Martin and Martin: If a field technician uploads inspections but accidentally inputs a typo under the manhole or pipe asset ID then the ...
Guest about 2 years ago in Info360 Asset / Import / Upload 0 Under consideration

Ability to see what Workspace(s) an Analytic is referenced in

From within an Analytic (Configuration or, more likely, Calculated Result) display the Workspace(s) the Analytic is already surfaced/referenced in for tracking purposes. This could apply to other areas in Info360 Plant to display where a particula...
Amelia over 1 year ago in Info360 Plant / Tools / Analytics 0 Under consideration

Transfer roughness values after cross section extension

When a cross section is extended, the roughness values are not populated automatically when it is probably valid in a significant number of cases to carry forward the existing roughnesses of the cross section end points.
Guest about 5 years ago in InfoWorks ICM / River Modeling 0 Under consideration

Support variable speed in live data

Variable speed is now an unsupported attribute in live data.
Evi Loozen about 5 years ago in InfoWorks WS Pro / Telemetry 2 Under consideration