Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 728

WS Pro control should be based on current time step

Add option in WS Pro so that control status of objects is controlled by the flow solution in the current time step, not the previous time step. The way WS Pro currently works, with the control based on the previous TS often results in pump on/off ...
Haddon Smith over 3 years ago in InfoWorks WS Pro / Engine 0 Gathering support

split network results lines

it would be great if the "splitting lines" function can be applied to network results lines too, which would help a lot if we need to break up a large amount of NRLs into multiple segments rather than redrawing them.
Guest almost 2 years ago in InfoWorks ICM / Hydraulics / Results 0 Gathering support

Updating a model in ICM Live is overly complicated and currently results in loss of data from previously ran simulations

The current process to update a model in ICM live is overly complicated and is currently not simple to grasp. This currently requires the removal of all runs from a particular manifest before you can remove and update the model being used. A simpl...
Guest almost 4 years ago in InfoWorks ICM / Live Modeling 0 Gathering support

Cumulative flow for comparison (via Result> Graph Report>Location/Simulation report

When producing flow comparison in InfoWorks ICM (via Result> Graph Report>Location/Simulation report) please add the cumulative flow (dynamically for the visible range). Currently this is available only for Graphing any single pipe. And also...
Mofazzal Syed almost 2 years ago in InfoWorks ICM / Reporting 0 Gathering support

AASHTO Culvert inspection standard

https://store.transportation.org/Item/CollectionDetail?ID=213
Mike Maylone almost 4 years ago in Info360 Asset / Inspections 1 Gathering support

Change Variable Speed Pumps Image

The image for Variable Speed Pumps under the "Other Special Diversion Examples" section is likely wrong. Looks like it is a copy of the image for Pump discharge pipes. Would be great if you could update with the right image! Thanks
Guest almost 4 years ago in InfoWorks ICM / Pumps 0 Gathering support

Warning Messages in InfoSewer

Is there a way to stop the program from checking for this? InfoWater has the Engineering Validation Manager which allows the “rules check” to be toggled on and off. The user does not want to see Negative Flow Warning messages in the RPT file of I...
ROBERT DICKENSON almost 4 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

As a user, when transmit a model in XPSWMM, I would like the externally referenced surface, soil and landuse also be packaged.

In XPSWMM, when 2D data are referenced externally, they are not packaged when transmit the model
Guest almost 4 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

As an XPSWMM user, I would like to be able to import flow data from SWMM5 Inflow/outflow formats. So that I can import results from CUHP.

For the latest versions of CUHP https://mhfd.org/resources/software/ , it is using the SWMM5 text inflow/outflows format for results. Therefore the old conversion tool in XPSWMM no longer works.
Guest almost 4 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

Automatic WO or Inspection Generation based on a risk threshold or CCTV data import

Making risk real time and tying it closer to actions which actually occur out in the field makes our software stickier.
Tim Medearis about 4 years ago in Info360 Asset / Work Management 0 Gathering support