Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks ICM

Showing 534 of 1329

ICM UPM tool - running all impact durations at the same time

For any CSO assessment we do, we always have to compare standards for all impact durations (1hr, 6hr, 24hr). We’ve found setting up the tool the exact same way 3 separate times, only selecting a different impact duration, very slow and inefficient...
Guest almost 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Add US and DS HGLs for links

Currently ICM link results report the US and DS total head values. As a user, I'd like to see the HGL at the US and DS locations consistent with the node results. This would be useful on graphs and long sections.
Guest over 2 years ago in InfoWorks ICM / Long Section / Profile 0 Gathering support

RTC range: give the choice to include or exclude the minimum or maximum value

Make it possible to define 'greater than (GT)' or 'greater or equal (GE)' in a range in RTC.
Guest over 2 years ago in InfoWorks ICM / RTC 0 Gathering support

RTC rules: order alphabetically

When copying rules, they appear in seemingly random order. When you have a lot of rules it can be very difficult to have an overview
Guest over 2 years ago in InfoWorks ICM / RTC 0 Gathering support

2D worst case analysis

I would like to be able to analyse a number of simulations in terms of the worst flood depth per 2D mesh element. An integrated tool (along the lines of the already existing worst case grid output) would avoid the need to mess around in external GIS.
Iain Scott over 4 years ago in InfoWorks ICM / 2D Flooding / Hydrology / Productivity 1 Gathering support

Statistic Report Batch Processing

As a user the ability to 'schedule' statistical reports would be extremely useful. currently if i'm generating a spill report on several overflows for a 10yr TSR series this can take several hours. The process effectively locks the software and pr...
Jason Drake almost 5 years ago in InfoWorks ICM / Productivity / Results 4 Gathering support

RTC rule themes

It would be great if it was possible to theme in the GeoPlan on the basis of the rules which are active for a given object at the visible timestep.
Guest over 5 years ago in InfoWorks ICM / Productivity 3 Under consideration

Results management - be able to see the size of sim results before they are downloaded from the cloud

It would offer additional, useful functionality if the user could see the size (MB/GB) of results files BEFORE downloading them locally. This could be shown via the log file, PRN, Results management, simulation properties, or all of the above. Any...
Saul Bradford over 1 year ago in InfoWorks ICM / Results 2 Gathering support

ICM InfoWorks SWMM5 Tools

ICM InfoWorks Networks has a long history of being both a great modeling platform but having a lot of SWMM5 features. To name a few, there is SWMM Runoff, SWMM Horton, SWMM Snowmelt, SWMM Green Ampt Infiltration, SWMM5 Water Quality, SWMM5 RTK, SW...
Robert Dickinson 5 months ago in InfoWorks ICM / Hydrology 0 For Review

'Find and Replace Flags' tool on multiple networks.

As a large organisation with multiple users of InfoWorks ICM we have a set up with one masterdatabase and everyone using groups off this in order to keep all users on the same version. The downside is, that as users import previous models more fla...
Tom Walker almost 5 years ago in InfoWorks ICM / Productivity 0 Gathering support