Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 728

It will great if we can control the display of the labels in ICM to have a better visualization.

For example : the possiblity of changing the precision in the labels (the decimal number of the value )
Guest almost 3 years ago in InfoWorks ICM / Visualization 3 Gathering support

Update Scenario Explorer terminology to match Run Manager

Modelers can use the "General" tab in the IWP Scenario Explorer to assign specific Report, Simulation and Time options to a scenario. To avoid confusion, the label shown in the Scenario Explorer should be changed to match the Run Manager.
Michael Kane 6 months ago in InfoWater Pro / Other 0 Gathering support

Option to relate split pipe ID to original ID

When splitting pipes, the new ID for the resulting pipe is based on the ID and Description tab in the model's Preferences. Instead of going with those settings, it would be nice to have an option to enable that would instead take the original ID a...
Kim Solberg 8 months ago in InfoWater Pro / Other / Productivity 0 Gathering support

Add an option to automatically Refresh All graphs in the Report Manager after a new run.

Currently when you complete a new run you have to remember to hit Refresh All in the Report Manager to see latest results. The use-case for viewing old run results is rare, so having an option to automatically refresh all graphs and tables would b...
Grant Clemens 10 months ago in InfoWater Pro / Productivity 0 Gathering support

Adding Level 3/4 water quality processing to the ICM upm tool.

For future catchment studies, we are looking at completing higher levels of water quality impact assessment, Level 3/Level 4. For this we would like the UPM tool to be able to integrate ICM river models to represent river flows and river quality a...
Guest over 1 year ago in InfoWorks ICM / Water Quality 0 Gathering support

Results management - be able to see the size of sim results before they are downloaded from the cloud

It would offer additional, useful functionality if the user could see the size (MB/GB) of results files BEFORE downloading them locally. This could be shown via the log file, PRN, Results management, simulation properties, or all of the above. Any...
Saul Bradford 12 months ago in InfoWorks ICM / Results 2 Gathering support

Be able to create selection lists using ICM Exchange from a list of Node or link IDs

No description provided
Guest over 4 years ago in InfoWorks ICM / API / Exchange / Productivity 1 Gathering support

UX: Allow decimal values without a leading zero

When adjusting values - you need to enter a leading zero to adjust by non-integer values. It would be nice to simply type '.5' if you need to lower by half a unit. The anticipation and early validation of the number is needless to toss a dialog bo...
Matt Anderson 7 months ago in InfoWorks ICM / Productivity 2 Gathering support

Export run results to csv: timestep options

When exporting run results to csv, it would be useful to select a timeframe you wish to export (excluding for instance the initial conditions that haven't settled into a level that makes sense). Also exporting at a different timestep than the one ...
Guest almost 2 years ago in InfoWorks ICM / Export Data / Results 0 Gathering support

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body about 5 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support