Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 278

NOAA Durations

InfoDrainage supports only a limited subset of NOAA Atlas 14 storm durations: 360 minutes (6 hours), 720 minutes (12 hours), 1440 minutes (24 hours), and 5760 minutes (4 days). However, NOAA Atlas 14 provides a broader range of precipitation durat...
Guest 2 months ago in InfoDrainage / Hydrology 0 For Review

Extra Results Outputs for some features in ICM

Hi there - Doing some work for a client I found the following limitations in results exports from Infoworks ICM: 2D Base Linear Structure: ls_underflow and ls_overflow results variables cannot have a summary of peak value exported by CSV or SHP. T...
Guest 3 months ago in InfoWorks ICM / Results 0 For Review

Create a better log file for unmapped InfoDrainage parts lists

When exporting C3D to InfoDrainage, there are sometimes warnings which occur. It'd be better for these warnings to be in a text format so they could be more user friendly for the user to correct the warnings.
Tim Medearis 2 months ago in InfoDrainage / Civil3D Integration 0 For Review

Resolving import errors for level events containing non-ASCII characters

When importing a generic CSV file containing non-ASCII characters (such as Japanese) as level events, double quotation marks ("") are added to the profile name. As a result, it no longer matches the outfall node ID, and the level is not applied co...
Yota Machii about 1 month ago in InfoWorks ICM / Import data 0 For Review

Raster export and import

Allow the use of rasters for importing and exporting data. Rasters take up significantly less space than a vector file and require less pre and post processing. Spatial layers like roughness, 2D hydraulic conditions, Infiltration, etc. could be im...
Andrew Sherson 5 months ago in InfoWorks ICM / Data Exchange 2 For Review

Expand gauged object results to all result fields

Currently the gauged object result fields are limited. For instance, they do not include 2d related results at nodes. As the use case for ICM has expanded so has the information that users are interested in. No longer as they just looked at 'flow ...
Alex Grist 9 months ago in InfoWorks ICM / Results 2 For Review

Delete Vertex in Pipe

I would like to be able to remove vertices from a pipe. Currently, you can only move the vertices or redraw the pipe. This process takes a while on big models and makes the distribution network more complicated.
Guest about 1 month ago in InfoWater Pro / Other 0 For Review

Ability to move labels to avoid overlaps

At the moment if labels overlap the only way to read the information on screen is to reduce all text size, which has other readability issues.
Matthew Johnson 9 months ago in InfoDrainage / Visualization 0 For Review

Add ability to see all pipes in Network Design Report

It is not possible to view the details / preliminary results of all the connections in the Network Design Report (each flow path needs to be selected in turn). This can be awkward for large networks.
Matthew Johnson 9 months ago in InfoDrainage / Auditing / Reviewing 0 For Review

Outfall Elevation Curve Time Series

Please add the ability to input decimal places for the Time in the Outfall Elevation Curves. Currently InfoDrainage only accepts whole numbers.
Guest 22 days ago in InfoDrainage / Hydraulics 0 For Review