ADD A NEW IDEA

InfoDrainage

Showing 190 of 1250

Change the size / dimensions of multiple manholes at once

MicroDrainage Network It would be very useful if it was possible to change the dims of many manholes at once. It'a a very laborious and time consuming task to change each dimension one-by-one, especially if the network is very large!
Guest over 2 years ago in InfoDrainage 1 Already exists

InfoDrainage - Time of entry to be called time of entry, not time of concentration

Te has specific meaning in the UK when using the rational method (modified). Tc also has speific meaning (Te + sumTf). It would be better if the software wants the user to input a Te, that it calls it Te. At the moment it calls the Te Time of conc...
Guest over 2 years ago in InfoDrainage 0 Gathering support

InfoDrainage - replace stormwater outline with DXF (or other similar file)

Would be useful to be able to 'replace outline' of a stormwater control by importing a polygon (e.g. DXF, SHP etc), rather than the existing options which are just to redraw in ID only. Every project there seems to be need to replace an outline fr...
Guest over 2 years ago in InfoDrainage 1 Already exists

Improved tutorial for setting up a network

InfoDrainage - i am just trailing software and using the metric tutorial. i do not like loading in items from MicroDrainage or AutoCAD and was hoping the tutorial would show how to quickly setup a highway drainage system with pipes/manholes/gullie...
Guest over 2 years ago in InfoDrainage 1 Under consideration

Enhance InfoDrainage Long Sections

No description provided
Guest over 2 years ago in InfoDrainage 1 In progress

Sewer Design - Locking gradients

It would be useful if you could lock sewer gradients or manhole relationships so that if you changed an upstream level it would automatically amend downstream levels
Guest over 2 years ago in InfoDrainage 1 Gathering support

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott 9 months ago in InfoDrainage / Rainfall 1 For Review

ILSAX Runoff Method

ILSAX is a public domain MS-DOS program developed from the South African ILLUDAS-SA program, which was itself a development of the American ILLUDAS program and the British Transport and Road Research Method (known as the TRRL or RRL model). It was...
matthew.piggott 9 months ago in InfoDrainage / Hydrology 1 Gathering support

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing 9 months ago in InfoDrainage / Reporting 3 Already exists

Output to 2D CAD to have option of what units to export in.

When using the output to CAD function often when opening the file it says its in inches or ft. It would be good to have the option to change this to m or mm.
Guest over 1 year ago in InfoDrainage / Data Exchange 1 Gathering support