5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott 8 months ago in InfoDrainage / Rainfall 1 For Review

ILSAX Runoff Method

ILSAX is a public domain MS-DOS program developed from the South African ILLUDAS-SA program, which was itself a development of the American ILLUDAS program and the British Transport and Road Research Method (known as the TRRL or RRL model). It was...
matthew.piggott 8 months ago in InfoDrainage / Hydrology 1 Gathering support

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing 8 months ago in InfoDrainage / Reporting 3 Already exists

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest 8 months ago in InfoDrainage / Visualization 1 Gathering support

Output to 2D CAD to have option of what units to export in.

When using the output to CAD function often when opening the file it says its in inches or ft. It would be good to have the option to change this to m or mm.
Guest over 1 year ago in InfoDrainage / Data Exchange 1 Gathering support

Switch design return periods when running cascade analysis

I would like to be able to build a single cascade model & able run it for various design return periods instead of needing to create separate cascade models for each return period.
Guest over 2 years ago in InfoDrainage 1 Already exists

Enable locking of pipe numbers

One of the aims of BIM is that all the different models you create match. If you issue a pipe network 3D model for construction with certain pipe numbering and then a minor change happens this can affect every pipe number in the system. But once i...
Guest over 2 years ago in InfoDrainage 0 Gathering support

Status Bar to report more significant figures

The status bar currently only displays levels (ground model level, water depth) to 1 decimal place. 2 Decimal places would be much more useful, Especially to ensure a node is at a low point or in the gutter invert..
Guest over 2 years ago in InfoDrainage 1 Already exists

Support Biodiversity net gain

Support the ability to create a biodiversity metric for SuDS structures as per the Defra tool.
Guest over 2 years ago in InfoDrainage 1 Gathering support

Link to InfoAsset Asset Management Software

Add a link to take drainage design data into Innovyze's InfoAsset Asset Management Software to complete the cycle of design - build - manage - maintain cycle.
Guest over 2 years ago in InfoDrainage 1 Will not implement