Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1369 of 1369

Log locations that most often cause timestep halving during a simulation

The "Job Progress" window provides information of the location that cause multiple iterations or reduced time-steps in the 1D model, under the headings "Link fail H", "Link fail Q", "Node fail". This is useful for diagnosing potential locations of...
Manu Ward almost 2 years ago in InfoWorks ICM / Results 2 Already exists

Publish InfoWorks WSPro critical link analysis module results to Info360 Insight - Incident Manager (building on work done in Info360 Asset)

With the InfoWorks WSPro Critical link analysis module results being made available within Info360 Asset for criticality/risk calculations - these results could potentially be valuable to operations in an incident or pipe break scenario (number of...
Patrick Bonk almost 2 years ago in Info360 Insight / Incident Manager 0 Under consideration

Export results to CSV/Database with a more flexible selection list in ICMLive

In ICMLive, we can now export results to CSV/Database with a pre-defined selection list. In ICM, we can have a more flexible way. For example if I hope to export results point (2D), initially I may have 1 million points. What we can do in ICM is, ...
Guest almost 6 years ago in InfoWorks ICM / Live Modeling 0 Gathering support

Calculatiton speed with diffusion needs to improve.

Diffusion will seriously slow down the model culculation. But generally the water quality models have to run for several years. With current simulation speed that would be unlikely to do a water quality simulation with diffusion.
Liu Qiusheng about 6 years ago in InfoWorks ICM / Info360 Cloud  / Pollutants / Water Quality 0 Gathering support

Include Modified Rainfall Frequencies and Distributions from Harris County Flood Control District in the NOAA Atlas 14 Storm Generator

No description provided
Guest about 4 years ago in InfoWorks ICM / Rainfall 0 Gathering support

Update of underlying data model to be included as an option on the welcome screen

The question has been raised regarding the manual upgrade of the underlying data model. The statement that it is up to the user to update the data before commencing analysis but it is a manual task. A suggestion was that perhaps this update could ...
Ann Pugh about 6 years ago in Other Product Ideas / Asset Management 0 For Review

Chicago Storm Generator

As a user, I want to generate a synthetic hyetorapg (Chicago Storm) rainfall based on IDF relationship so these storms can be used in ICM.
Guest about 6 years ago in InfoWorks ICM / Rainfall 0 Gathering support

Pasting Profile Names

While pasting grids with headers populates profile names - its not easy to accomplish when appending to the end of a table. One has to create a blank, and then tell the application to paste new profiles. This doesnt work from last profile. This wo...
Guest about 2 years ago in InfoWorks ICM / Grids 0 Gathering support

Enable HEC-DSS connection to InfoWorks ICM for Time Series

HEC-DSS is the Corp of Engineers version ofTSDB - so exchanging time series, flow or other boundary data with DSS is key
Guest about 2 years ago in InfoWorks ICM / Data Exchange 0 Gathering support

Enable re-runs for selected scenarios

With the new Reserved Run workflow I can re-run simulations with my latest changes quickly without needing to commit. However if I'm using scenarios in the run, WS Pro re-runs all scenarios every time, even if there weren't any changes. I want an ...
Nathan Gerdts about 2 years ago in InfoWorks WS Pro / Productivity 0 Gathering support