Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 170 of 1370

Option to relate split pipe ID to original ID

When splitting pipes, the new ID for the resulting pipe is based on the ID and Description tab in the model's Preferences. Instead of going with those settings, it would be nice to have an option to enable that would instead take the original ID a...
Kim Solberg over 1 year ago in InfoWater Pro / Other / Productivity 0 Gathering support

Zoom (flexible) graphs once x-axis values set

When using flexible graphs (including obsevered predicted, etc) in ICM, there is the possibility to specify the x-axis extents (i.e. time and date) explicitly via the data dialogues. However, once I have specified them this way, the traditional zo...
Iain Scott 7 months ago in InfoWorks ICM / Results 0 Gathering support

Export manager scope should include Selection Sets

Export manager "Element Scope" currently only allows All, Domain, and User selection for the scope of the elements to export. A combo box with the list of selection sets would be useful and likely easy to implement.
Colin Ricks almost 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Ability to add a customer line on a graph

It would be nice if you had the ability to add a line on to a graph at a specific interval on the axis. This would make it easier to visual if a specific level has been reached, for instance.
Alex Grist 7 months ago in InfoWorks ICM / Results 1 Gathering support

Automatically clean completed items from Job Control window

When using InfoWorks ICM across a workgroup server, all the simulations are visible by all users in the job control window. To keep the list manageable this requires each individual user to remember to click remove completed jobs regularly. As lon...
Tom Walker over 1 year ago in InfoWorks ICM / Results 2 Already exists

Calculating volume storage on river reaches

In the application of ICM, we often count the regulation volume of river channels.But at the moment we can only calculatethe total available volume of channels/river reaches between two cross sections by using length and cross sectional areas.If t...
Guest over 5 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Pressure Relief Valve

Which valve, if any, would represent a pressure relief valve? Where the pressure on the upstream is not allowed to exceed a certain psi. If it exceeds the specified pressure on the upstream side the valve will open.
Guest 11 months ago in InfoWater Pro / Operational Modeling 2 For Review

Create an option in the Domain Manager to add elements by ID

The workflow to add a list of element IDs to the domain is too complicated. Simplify this by creating a new option in the Domain Manager, it could just open a table where you set the number of rows and paste IDs from a list/table copied from a pro...
Grant Clemens almost 2 years ago in InfoWater Pro / Productivity 2 Under consideration

Add button for show/hide inactive elements.

I frequently turn the inactive elements on & off in InfoWater Pro. Right now, this requires multiple mouse clicks & is inefficient. A button added to the ribbon and/or Model Explorer would be ideal.
Guest almost 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Update Scenario Explorer terminology to match Run Manager

Modelers can use the "General" tab in the IWP Scenario Explorer to assign specific Report, Simulation and Time options to a scenario. To avoid confusion, the label shown in the Scenario Explorer should be changed to match the Run Manager.
Michael Kane over 1 year ago in InfoWater Pro / Other 0 Gathering support