Pause simulations during server restarts

Please could we have an ability to auto-pause simulations whilst an InfoWorks ICM server is restarted? As part of the wider drive to reduce CSO spills there is an increasing need to run long time series through sewer models. This can require model...
Tom Walker almost 3 years ago in InfoWorks ICM / Simulations 2 Gathering support

Incorporate the ability to create custom grate inlets. Currently InfoDrainage only allows for HEC22 defined inlet grate types to be used.

Some municipalities across New Zealand and other parts of the world require designers to use specified inlet grate types with defined inlet efficiency curves. There are two ways in which the custom inlet grate type this can be incorporated into In...
Quinton Botha about 1 year ago in InfoDrainage / Hydraulics 2 For Review

Please add an Innovyze section to the autodesk forums

Hello, Innovyze previously had a forum available for their products. After the software was purchased by autodesk, this no longer seems to exist. I believe having a forum where users can post questions and troubleshoot their issues would be very h...
Endrit Shabani about 2 years ago in InfoWater Pro / Other 2 Gathering support

Have all the functionality available in the 'Manage scenarios' dialogue in the ICM, to also be available via ICM Exchange

Options such as 'Reintegrate' & Duplicate'
Guest over 5 years ago in InfoWorks ICM / API / Exchange 0 Gathering support

Support for ArcGIS Enterprise Portal (public)

Integrate with ArcGIS Enterprise Portal
Mike Maylone over 2 years ago in Info360 Asset / Esri 6 In progress

Pipe clash detection when foul network phase is active

When working through clashes between surface water and foul networks, you can only access the pipe clash analysis within surface water analysis tab. This means if I want to change the depth of the foul network to avoid the clash then I have to swa...
Henry Wilkinson 8 months ago in InfoDrainage / Productivity 1 For Review

Perforated Pipe as Connection Type

I would like to be able to model a perforated pipe as a connection type rather than use an infiltration trench and short branches of pipes to connect them to other stormwater controls. These infiltration trenches are not collecting inflow from sur...
Midori Patterson almost 2 years ago in InfoDrainage / Hydraulics 1 Gathering support

Graph RTC variables

RTC variables can be useful when modelling complex systems, but while I can check individual timestep values of variables using the log, it would be helpful to be able to visualize these on a graph (and compare it with other simulation results).
Iain Scott 8 months ago in InfoWorks ICM / Results 3 Gathering support

Upstream and Downstream Trace Icons are misleading

Minor annoyance here and possible solution- can you change the icons for the upstream and downstream trace to actually be meaningful? at the moment both icons represent downstream and upstream trace at the same time and it doesn't make sense
Daniel Alexander 6 months ago in InfoWorks WS Pro / Other 1 Gathering support

Non-circular pipes

Please add non-circular pipes to InfoDrainage, similar to those available SSA. These need the ability to connect to manholes at either end at a minimum, but the option to be culverted as well is welcomed.
Guest about 1 year ago in InfoDrainage / Hydraulics 1 For Review