Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1372 of 1372

NOAA Durations

InfoDrainage supports only a limited subset of NOAA Atlas 14 storm durations: 360 minutes (6 hours), 720 minutes (12 hours), 1440 minutes (24 hours), and 5760 minutes (4 days). However, NOAA Atlas 14 provides a broader range of precipitation durat...
Guest 7 months ago in InfoDrainage / Hydrology 0 For Review

Multiple return period hydrograph

Currently, InfoDrainage restricts each hydrograph to a single return period, which creates inefficiencies when analyzing stormwater systems across multiple design storms. To accommodate analyses for 2-, 10-, and 100-year events, for example, users...
Guest 7 months ago in InfoDrainage / Hydrology 0 For Review

2D worst case analysis

I would like to be able to analyse a number of simulations in terms of the worst flood depth per 2D mesh element. An integrated tool (along the lines of the already existing worst case grid output) would avoid the need to mess around in external GIS.
Iain Scott almost 5 years ago in InfoWorks ICM / 2D Flooding / Hydrology / Productivity 1 Gathering support

Make Themes sharable between network types

An external IWS file stores a Network type, however, there are uniform Theming that can or should be shared - like Ground Models. Themes needs an overhall to share across models so we dont need to recreate the wheel or edit XML files to get things...
Guest about 2 years ago in InfoWorks ICM / Network 1 Gathering support

Add a new Special Query for "Demand Junctions" in the Domain Manager

Currently you have to either make your own tediously long query, or you can run a simulation and use output filters, but it should exist as a built-in Special Query.
Grant Clemens over 1 year ago in InfoWater Pro / Productivity 1 Gathering support

Antecedent conditions as a direct run input for design events

I would like an object similar to the 'Catchment Initial Conditions' object for the TSB, that would allow a user to directly specify and overwrite the initial NAPI value, soil store level and groundwater level, per each individual subcatchment, in...
Guest 9 months ago in InfoWorks ICM / Rainfall 0 For Review

Statistic Report Batch Processing

As a user the ability to 'schedule' statistical reports would be extremely useful. currently if i'm generating a spill report on several overflows for a 10yr TSR series this can take several hours. The process effectively locks the software and pr...
Jason Drake over 5 years ago in InfoWorks ICM / Productivity / Results 4 Gathering support

Add section results to profile view

I would like to view the water level (or velocity, froude number etc...) at each cross section when displaying a river reach long profile.
Raphael BAUBION 5 months ago in InfoWorks ICM / Long Section / Profile 1 For Review

Enable 3d view of two phases (foul and surface) simultaneously to help resolve clashes found in clash analysis.

Clash Analysis identifies pipes touching, which may be in different phases. The ability to view both phases in 3D View (as you can in Plan View) would make resolving the clashes much more efficient.
Guest about 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Add support for nodes in Infoworks ICM "custom graph observed/predicted report" to compare water level

I would like to compare predicted(sim) and observed values at nodes for level. Currently the report only supports links, and the closest thing is the pipe depth at the node.
Mel Meng over 1 year ago in InfoWorks ICM / Reporting 0 Gathering support