Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 778

ICM Status bar to show more significant figures

The status bar currently only displays levels (ground model level, water depth) to 1 decimal place. 2 Decimal places would be much more useful, Especially to ensure a node is at a low point or in the gutter invert..
Gregory Smith almost 5 years ago in InfoWorks ICM / Productivity / Visualization 1 Gathering support

Work Order Close & Follow Up

No description provided
Mike Maylone almost 3 years ago in Info360 Asset / Work Management 0 Gathering support

When Survey Length is Different than pipe length, do not give a warning unless it is larger than 5ft difference.

Many inspections end up with warnings when this very common issue comes up. Most of the time survey length and pipe length will be different because the GIS is not 100% perfect.
Guest almost 3 years ago in Info360 Asset / Inspection & Media Management Workflows 1 Gathering support

Compare WWG and TWG files

A tool to compare different WWG files and TWG files and report on the differences, similar to the Compare functionality for Networks.
Guest almost 3 years ago in InfoWorks ICM / Import data 1 Gathering support

Node Name Generation Default

In WS PRO it would be great to be able to set Node Name Generation format as a default for all networks in a database instead of having to enter it in every time I want to add nodes to a network
Guest almost 6 years ago in InfoWorks WS Pro 0 Gathering support

Dissolve river reaches into multiple river reaches

It would be great to have the capability to generate automatically and perfectly snapped nodes in all/some of the X-sections of one/multiple river reaches in ICM and therefore split that river reach into various river reaches (kind of the opposite...
Guest almost 6 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Implement the Inflow Time Series Scaling Factor in InfoWorks from ICM SWMM

Scale Factor In ICM SWMM or SWMM5 a multiplier is used to adjust the values of the constituent's inflow time series. The scale factor can have several uses, such as allowing one to easily change the magnitude of an inflow hydrograph while keeping ...
Robert Dickinson almost 2 years ago in InfoWorks ICM / Flow 0 Gathering support

Simple means to set initial storage area water surface elevations

Please incorporate a system for setting initial water surface elevations in storage nodes that works as easily as the process is in XPSWMM or HEC-RAS. The program should hold this water level during warm-up stabilization.
Guest almost 6 years ago in InfoWorks ICM / Hydraulics / Simulations 0 Gathering support

user defined boolean fields

Ability to create user defined boolean fields in order to incorporate fields within corporate GIS system
Richard Robinson almost 6 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

XPSWMM Inlet capacity - head difference rating or geometry-based inlets

Inlet capacity creates a second node internally to XPSWMM. Currently, the rating curve methods for it are calculated based on node depth, rather than head differential, which doesn’t work right with 2D if the storm sewer HGL is above the gutter. ...
Guest almost 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support