Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 942 of 1442

Multiple return period hydrograph

Currently, InfoDrainage restricts each hydrograph to a single return period, which creates inefficiencies when analyzing stormwater systems across multiple design storms. To accommodate analyses for 2-, 10-, and 100-year events, for example, users...
Guest 11 months ago in InfoDrainage / Hydrology 0 For Review

Modelling intermediate check dams and weirs in open channels including ponds ands swales

Currently, InfoDrainage only allows modeling of check dams or weirs at outlets. For open channels with multiple intermediate check dams, users must split the channel into sections, each with its own outfall defined. A more accurate feature allowin...
Dilraj KT over 2 years ago in InfoDrainage / Hydraulics 1 Gathering support

Button: Apply to all phases

To each of the build screens, next to "apply", add another button, "apply to all phases". This would save a lot of time when making tweaks to models for which more than one phase is being run (which is most models)
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Provide Enhanced Manhole Schedule Details

It would be great to have the option of providing an additional level of customisable detail which could be configured on MH Schedules. As an example including practical details around the cover – contractors want to know and see more from a MH s...
Guest over 3 years ago in InfoDrainage 1 Gathering support

Export run results to csv: timestep options

When exporting run results to csv, it would be useful to select a timeframe you wish to export (excluding for instance the initial conditions that haven't settled into a level that makes sense). Also exporting at a different timestep than the one ...
Guest about 3 years ago in InfoWorks ICM / Export Data / Results 0 Gathering support

Pop out windows for tabs

This would be useful so then one would be able to view multiple long-sections and view the map at the same time on different screens, rather than being limited to one tab at a time.
Guest 8 months ago in InfoWorks ICM / Visualization 1 For Review

Pipe clash detection when foul network phase is active

When working through clashes between surface water and foul networks, you can only access the pipe clash analysis within surface water analysis tab. This means if I want to change the depth of the foul network to avoid the clash then I have to swa...
Henry Wilkinson 11 months ago in InfoDrainage / Productivity 1 For Review

Inverse Distance Weightage in ICM

We have Thiessen in ICM. It will be great if we have IDW like what we have in RS.
Faizah Ahmad over 6 years ago in InfoWorks ICM / Hydrology / Rainfall / Simulations 1 Gathering support

Use ruby to edit rainfall dialogue box

Exporting rainfall files to csv for manipulation creates details of the storm events themselves, we would like to be able to change the return periods, durations, multiplying factors shown in the rainfall dialogue editor instead.
Guest over 6 years ago in InfoWorks ICM / API / Exchange / Productivity / Rainfall 0 Gathering support

Flooding extents boundary

Would like the ability to export the maximum 2D flooded boundary so I can show this in Civil 3D.
Guest about 1 year ago in InfoDrainage / 2D Flooding 2 Already exists