Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 338 of 1370

RTC Naming

Allow longer names for RTC definitions (Rules, Logic, Variables, etc.). Current limitation of 10 characters for a name is debilitating for more complex logic trees (especially in Global) and does not permit easily named element descriptors.
Dave White about 1 year ago in InfoWorks ICM / RTC 1 Under consideration

Pipe names missing in export from Civil3D

When exporting pipes from Civil3D to Infodrainage, the pipe names keep reverting to the autogenerated names given when pipe is created in Civil3D even though they were renamed in Civil3D.
Jenna Woyner almost 2 years ago in InfoDrainage / Civil3D Integration 1 Under consideration

Level Soffits in pipe network.

Although you can select Level Soffits in the Network Wizard, if you make a change in the manhole depth for example, the pipes in the network will return to invert level, which means that you will have to readjust them manually.
Konstantinos Koutroulis almost 2 years ago in InfoDrainage / Hydraulics 1 In progress

Go To button to zoom to a certain pipe from the Connection table

In Civil 3D you can zoom to/select a pipe from the pipe table. It is very difficult to find specific pipes in InfoDrainage.
Daniel'le DeVoss 9 months ago in InfoDrainage / Auditing / Reviewing 0 For Review

Capability to model water distribution network in ICM

Can the function of “ForceMain” in InfoWorks ICM be expanded so that ICM can model the water distribution network. Or the InfoWorks WS function be included in ICM. This is often a requirement when the recycled network and sewer network are to be m...
XJ Wang 7 months ago in InfoWorks ICM / Hydraulics 2 Will not implement

Allow two Infodrainage files to be combined

Request for a paste, copy, cut branch to file options, to allow two Infodrainage files to be combined. As the available in Microdrainage
Guest over 1 year ago in InfoDrainage / Other 2 Under consideration

Calculating and adding the Froude number to storm table output

Many municipalities and utilities want to maintain subcritical flow in the storm sewer system and avoid hydraulic jumps. The Froude number is used to establish subcritical vs. supercritical flow.
Guest about 1 year ago in InfoDrainage / Reporting 2 For Review

NOAA Durations

InfoDrainage supports only a limited subset of NOAA Atlas 14 storm durations: 360 minutes (6 hours), 720 minutes (12 hours), 1440 minutes (24 hours), and 5760 minutes (4 days). However, NOAA Atlas 14 provides a broader range of precipitation durat...
Guest 7 months ago in InfoDrainage / Hydrology 0 For Review

Multiple return period hydrograph

Currently, InfoDrainage restricts each hydrograph to a single return period, which creates inefficiencies when analyzing stormwater systems across multiple design storms. To accommodate analyses for 2-, 10-, and 100-year events, for example, users...
Guest 7 months ago in InfoDrainage / Hydrology 0 For Review

2D worst case analysis

I would like to be able to analyse a number of simulations in terms of the worst flood depth per 2D mesh element. An integrated tool (along the lines of the already existing worst case grid output) would avoid the need to mess around in external GIS.
Iain Scott almost 5 years ago in InfoWorks ICM / 2D Flooding / Hydrology / Productivity 1 Gathering support