Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Retain decimal places when copying/pasting grid values

For most numerical values in a model, ICM can hold 8 decimal places. From the grid view, if you copy/paste a single cell value, the full set of decimal values are preserved. However, if you copy multiple cell values at once (e.g. an entire column)...
Jason Kulsdom over 3 years ago in InfoWorks ICM / Grids / Reporting 0 Gathering support

Assign Channel shape from ground model using cross section

In ICM I can sample elevations from ground model to cross section line and use that for river reaches, but sometimes I just want to use simple Channel links or maybe I'm using the SWMM engine which doesn't have rivers. I want to pull the channel ...
Guest over 5 years ago in InfoWorks ICM / Hydraulics / River Modeling 1 Gathering support

Allow user to set number format in ICM grid windows

It would be great if a user could set number formats in InfoWorks ICM grid windows. For example, we are calibrating a large diameter pipeline by adjusting Manning's n values. We are using 5 digits after the decimal place, but ICM only shows 4 digi...
Andrew Fugal over 5 years ago in InfoWorks ICM / Other 1 Gathering support

A Mesh Layer export function to facilitate the analysis and visualization of temporal mesh element results in QGIS.

I would like to see a Mesh Layer export function that would facilitate the analysis and visualization of temporal mesh element results in QGIS. Use case example: https://qgis.org/en/site/forusers/visualchangelog312/index.html#feature-vector-trace...
Guest almost 6 years ago in InfoWorks ICM / Export Data / GIS Layers / Results 0 Gathering support

Rework Graphic User Interface

I have used other Innovyze products with great success such as Infowater, InfoWater Pro, InfoSewer, and InfoSWMM. The GUI of these programs is intuitive and easy for me to pick as well as teach other members of my modeling team how to operate the ...
Guest over 2 years ago in InfoWorks ICM / Productivity 3 Gathering support

A Case for Supporting 2 InfoWorks and 2 SWMM Networks as the current and background networks

A Case for Supporting 2 InfoWorks and 2 SWMM Networks as the current and background networks. In other words, InfoWorks is the current background, and SWMM is the current and background. Right now, it is SWMM and InfoWorks as the current and backg...
Robert Dickinson over 1 year ago in InfoWorks ICM / Workgroup 2 Will not implement

Statistical Analysis of ARR Temporal Pattern Ensembles should be enabled

Infoworks ICM should aim to facilitate statistical analysis of temporal pattern ensembles of ARR with a single click. Easily accessing and reviewing the statistical parameters for the required temporal pattern ensembles will allow Australian users...
Guest almost 2 years ago in InfoWorks ICM / Results 0 Gathering support

adjustments to a selected set of scenario's

In my opinion it would be very useful if you could make the same adjustments in one stretch for a selected set of scenario's. Similar to an adjustement you make in the base scenario that effects all the underlaying scenario's but than for a specif...
Guest about 4 years ago in InfoWorks ICM / Scenario 1 Gathering support

Split a subcatchment

To be able to easily split a subcatchment into 2 separate subcatchments. For example when it becomes obvious that the flow from a subcatchment cannot be collected at a pit (node), it becomes necessary to insert an additional pit (node) to captur...
Gregory Smith about 4 years ago in InfoWorks ICM / Hydrology 3 Already exists

Smart meters

Water utilities in Australia are installing smart meters in domestic and other non residential properties. Smart meters generates large data sets at each and every individual properties. Any thoughts to integrate those data in to the distribution ...
Guest about 6 years ago in InfoWorks WS Pro / Data Exchange / Telemetry 2 Under consideration