Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 106 of 1370

Progress bar to show status of results being downloaded from the cloud

By default, ICM Cloud simulations store results in the cloud. When downloading results to a local results folder, the 'Status' in the 'Job Control' window only displays 'Downloading results' without providing details such as the amount of data dow...
Rahul Raj 19 days ago in InfoWorks ICM / Results 2 Under consideration

Support for ArcEngine Functions for background layers (no x32 bit support)

The current x64 version of ICM cannot use the ArcEngine / ArcGIS Desktop funcionality, in contrast to previous x32 bit versions of ICM. Since only x64 bit version is now supported, this feature cannot be used. It is one of the most important featu...
Elliot Egan about 2 years ago in InfoWorks ICM / GIS Layers 1 In progress

possibility to connect labels to links at the beginning or end instead of only in the middle of the link

This way you can show that link invert levels on a manhole differ in value or deviate from the chamberfloor
Loes van der Linden 10 months ago in InfoWorks ICM / Labels 3 Already exists

Themes to include robust SQLs

Can we enhance conduit theming using robust SQL queries? We're aiming to apply themes based on the mean of minimum upstream and downstream velocities in each conduit over the TSR simulation. Considering the multiple scenarios involved in system de...
Parameswara Rao Narra 5 months ago in InfoWorks ICM / Theme 4 Already exists

worst case Grid report to include min values

Can the worst case grid report be enhanced to include minimum values for velocity and flow, similar to how it currently reports maximum upstream and downstream flow? This addition would be highly beneficial for understanding hydraulic behavior dur...
Parameswara Rao Narra 5 months ago in InfoWorks ICM / Results 3 Already exists

Expand gauged object results to all result fields

Currently the gauged object result fields are limited. For instance, they do not include 2d related results at nodes. As the use case for ICM has expanded so has the information that users are interested in. No longer as they just looked at 'flow ...
Alex Grist about 1 year ago in InfoWorks ICM / Results 3 Under consideration

Display critical results for indvidual elements

With the variability of design rainfall patterns, critical hydraulic results (mean/median/min/max) often occur at different rainfall durations for different elements (eg specific pipe/MH/channel/etc) within a network for the same rainfall event pr...
matthew.piggott about 1 year ago in InfoWorks ICM / Results 2 Already exists

Improve database and results files read performance

When opening an ICM network for the first time (i.e. no network files in the local files "Working" folder), the WDS reads through the database file in 4 kB chunks to retrieve the requested version of the network. This read process appears to be li...
Peter Dunlop almost 4 years ago in InfoWorks ICM / Performance / Results 3 Gathering support

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh about 6 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body almost 6 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support