InfoWater Pro

Showing 115 of 1423

Allow Customized Reports to Also Include Standard and Fireflow Results - Just Have One Result Table

Currently all model element information and results are separated between the DB Editor, Customizable Report, and Output Report/Graph. This is confusing and hard to export specific information together without having to combine it later in Excel o...
Joe Lawrence almost 5 years ago in InfoWater Pro 1 Gathering support

Include an "excluded search nodes" warning in fireflow output table

When the design pressure exceeds the static pressure at a particular node, that node will be excluded from a design fireflow model run. The output table should include a banner at the top listing the excluded nodes, as these can make a big differe...
Guest almost 5 years ago in InfoWater Pro / Engine 0 In progress

Isolation Scenario Using Dummy Valves Which Do Not Split Pipes

Can you put a valve on top of a pipe (not splitting the pipe) and then it closes the section? And then anything enclosed to these multiple valves will be isolated? This is going to be useful for modelling of isolation scenarios
Guest about 2 years ago in InfoWater Pro / Operational Modeling 3 Gathering support

Improvements to "Edit Attributes" table

The "Edit Attributes" window (accessed by using the "Edit Selection" or "Edit Domain" buttons) is a useful table to quickly view and edit all the physical information for each facility type together. However, it has some useability issues that som...
Colin Ricks about 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Hydrant and valve placement optimization

Hi there, We have been discussing the valve optimization in the whole County and if the InfoWater Pro can have the function to optimize the placements of hydrants and valves in the network to facilitate the design and high-level planning, that wou...
Guest over 2 years ago in InfoWater Pro / Productivity 1 Gathering support

Modify How InfoSurge Counts Features for Licensing

We have 20,000-pipe InfoSurge licenses. We frequently have operational models larger than that, where we want to perform Surge modeling. Even if we deactivate portions of the network, InfoSurge still counts the total number of features. This waste...
Guest about 5 years ago in InfoWater Pro 1 Will not implement

New Feature is Active in All Scenarios Option (InfoWater/Pro)

Add a tools/options option so when you add new features they will be active in all scenarios, instead of getting errors 100 times for every scenario you try to run where the features were not included originally. This would be especially useful wh...
Guest about 5 years ago in InfoWater Pro / Productivity 0 Gathering support

CAM Enhancement

CAM Enhancements A few things to consider that I think would make your tool better than others I have seen/used: 1. The ability to export the pounded areas into GIS. It seems to me this shouldn’t be difficult as you are color coding them now in ...
Guest about 5 years ago in InfoWater Pro / Engine 1 In progress

Simple Criticality Assessment Manager reporting in InfoWater Pro

I want a simple report for each pounded area between valves, reporting the length of pipe affected, number of customers, number of critical customers, amount of demand taken offline by isolation, and possibly the total volume of demand lost betwee...
Guest over 5 years ago in InfoWater Pro 1 In progress

Account for multi-connection properties during criticality analysis

Some hospitals for example have multiple service laterals connecting them to the network. If one line is cut off from service due to a repair, the hospital can still get water. As a result, criticality is overestimated when this logic is ignored. ...
Nathan Gerdts over 2 years ago in InfoWater Pro / Other 0 Gathering support