Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Allow changing displayed simple junction size

In plan view we are able to change the sizes of icons, labels, proper manholes and many other parts of our pipe networks, but the symbology for simple junctions is fixed in size (at about 1.2m?) and cannot be changed, which makes modelling, for ex...
Guest over 1 year ago in InfoDrainage / Productivity 0 For Review

InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

Allow the Analysis Run to recalculate precedent Analyses before running itself. I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not neces...
Bradley Nissley over 6 years ago in Other Product Ideas / Asset Management 0 Under consideration

Simulation Health Improvements

In certain instances, the suggestions provided in "Simulation Health: The results indicate flow continuity issues, even when the shortest time step is already selected in InfoDrainage" may not resolve the problem. This could be addressed by incorp...
Guest over 2 years ago in InfoDrainage / Hydraulics 1 In progress

Add Gravel Pit to Soakaway Design Tool

As a former MicroDrainage user, I'm struggling to model soakaways in InfoDrainage, as InfoDrainage does not account for storage volume within the gravel filter media that surrounds the soakaway. The gravel pit also provides larger area of infiltra...
Aleks Persins over 2 years ago in InfoDrainage / Hydraulics 5 Already exists

Options to export the statistics block of Graph template/Custom Graph

At the moment, from many cases one can export whole time series of flow/depth etc... then have to calculate the cumulative volume or max flow...despite that statistics are visible in the graph. Allow an option to export the statistics alongside ti...
Guest over 3 years ago in InfoWorks ICM / Export Data 0 Gathering support

Option for "downstream node" when allocating demand by pipe

The current "farthest node" option I believe just places the demand at the opposite end of the pipe compared to the meter point. Instead I'd like an option for all the meter demands to be placed at the pipe's end node. "Downstream" would probably ...
Eric King over 1 year ago in InfoWater Pro / Other 0 For Review

Add CAD importer to Open Data Import/Export

Currently the import from CAD .dwg is a separate importer with less features than the full Open Data Import/Export options. It'd be great to simplify and bring this into the standard import/export exchange, especially since WS Pro is now an Autode...
Tim Medearis over 2 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Variable baseflow

(Could also be considered hydraulics) On large scale projects where we may have limited information and funding, we assume baseflow values through an upstream point inflow. It would be beneficial to have a variable baseflow input per design storm....
Jess Ewing over 2 years ago in InfoDrainage / Hydrology 1 Gathering support

Option to lock units (XY Coordinates) by network

Maintain consistency across users and through time by locking units to networks, rather than units being set on a user by user basis. Primarily x-y coordinates units to eliminate potential conflicts of import and export and cross platform uniformity.
Guest over 3 years ago in InfoWorks ICM / Network 0 Gathering support

Include weirs and orifices in xpswmm ensemble statistics

Please include weirs and orifices in the ARR Ensemble Statistics summary. Currently, only conduits or natural channels are included.
Guest almost 6 years ago in InfoWorks ICM / Results 0 Gathering support