Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 868 of 1442

2D simulations failing due to bad geometry polygons

The issue involves a simulation failing due to a bad geometry building polygon. Although there was no critical error during the meshing process, the simulation failed at the initialization stage. In this particular instance, the client resolved th...
Guest about 1 year ago in InfoWorks ICM / Errors 1 Will not implement

Include NSW specific data to ARR Storm Generator

The state of NSW provides additional data that supersedes the pre-burst and Initial loss data provided in the data downloaded through the Data Hub. As a user I would like the option to easily modify the pre-burst rainfall applied to the from of th...
Guest almost 5 years ago in InfoWorks ICM / Rainfall 0 Gathering support

Alert Action Repetition Control - repeat action after alert has been active for Xnr runs

We have a model set up to process the EA's flood alerts and send out warnings when new ones become active. The model runs every 30 minutes, so we pick up the latest alerts and the repetition control is set to once so people don't become drowned in...
Geoffrey Brown about 6 years ago in InfoWorks ICM / Live Modeling 0 Gathering support

Lets celebrate World Inclusion Day by removing gender specific terminology

Suggest we stop using the term 'manhole' and use 'maintenance hole' or 'maintenance pit' instead.
Brad Thompson over 2 years ago in Info360 Asset / Asset / Spatial Data Import 0 Will not implement

Generate Risk/Rehab results for segments not assets - Stormwater

In stormwater systems assets change structural characteristics along the length of the asset. This means, materials change and this needs to be represented in the risk analysis. In addition, work tasks are generated for segments instead of the ful...
Martha Nunez over 2 years ago in Info360 Asset / Risk 0 Gathering support

User defined results fields

Can we have user defined results fields? these would allow us to generate time series results that could include the total flows from a series of subcatchments or the total flow going to a node. another example is where we are required to generate...
Richard Body over 6 years ago in InfoWorks ICM / Productivity 2 Gathering support

Field construction year reference for simulation run.

The field construction year of each object type from WS Pro are not linked to the simulation runtime, so you can get information for future infrastructures that you need to move away from your model or transfer to a new model or scenario. It wo...
Guest over 2 years ago in InfoWorks WS Pro / Engine 1 Gathering support

I want Infoworks' "Export maxima to GIS" to include the below parameters to assist scour protection design within 2D Zone

1. For shear-stress-based design 1.1 Max Shear Stress (in N/m2 with at least 1 digit after the decimal point) 1.2 Hydraulic Slope at Max Shear Stress (in percent with at least 3 digits after the decimal point) 2. For velocity-based design 2.1. Max...
Phuong Mai almost 4 years ago in InfoWorks ICM / Export Data / GIS Layers / Simulations 1 Gathering support

Allow to Use TSDB when running a simulation in ICM Exchange

Running a simulation with TSDB data is currently not supported in ICM Exchange.
Guest over 6 years ago in InfoWorks ICM / API / Exchange / Events 0 Gathering support

Risk Master Update in line with changes to MCM

the MCM has been updated in recent years yet Risk Master has not been updated in line with this. It will no longer import the MCM tables directly due to formatting changes. There is also no option to import residential curves 'relative to value'. ...
Guest over 2 years ago in InfoWorks ICM 0 Gathering support