Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1370 of 1370

Cancel graphs early

Add the ability to cancel out of loading a graph of observed vs predicted if it is taking too long. Particularly a problem with large run results or large observed datasets such as SCADA raw data. Can freeze the software for a very, very long time...
Guest 3 months ago in InfoWorks ICM / Calibration 2 Gathering support

When importing BEFDSS CCTV surveys allow for update by ID.

When importing CCTV surveys following the BEFDSS (Belgian) standard, it's only possible to update existing surveys by matching on AAD + AAF + ABJ fields. It would make our lives a lot easier when it would be possible to update existing surveys by ...
Ward Delabastita 3 months ago in Other Product Ideas / Asset Management 0 For Review

Create InfoAsset Manager viewer

There is InfoWors ICM Viewer and this viewer has been very helpful for multiple users. I hope that the InfoAsset Manager gets to have a similar viewer too.
Guest 7 months ago in Other Product Ideas / Other 0 For Review

Copy Stored Graphs with InfoWater Sync

Please add support for copying Stored Graphs between local and server copies of models with the InfoWater Sync tool. This is a very important tool for evaluating models and it would be very helpful to retain them when syncing between a server and ...
Guest 4 months ago in InfoWater Pro / Data Exchange 1 Under consideration

2D meshing using Ruby and ICM Exchange

As part of DWMP we are likely to need to create multiple scenarios for each network based on Growth (2035, 2045 etc...). One of the approaches ot the detriment anaylsis will require a 2D approach. Would it be possible to allow meshing from within ...
Jose Pereira about 1 year ago in InfoWorks ICM / API / Exchange 2 Under consideration
108 VOTE

Support for multiple screens

Would like to be able to work across multiple screens - plan view on one screen and long section/grid/graph on another.
Ann Pugh about 6 years ago in InfoWorks ICM / Productivity 4 Will not implement

Query “System Demand” results for “totalized” volume

It is universally understood that “the area under the curve” approximates the total volume of water for each of the “System Demand” output graphs in InfoWater Pro. Although a “Totalizer” can be applied to a pipe, it is not currently possible to qu...
Michael Kane 3 months ago in InfoWater Pro / Productivity 1 Gathering support

Connect storage nodes to 2D mesh

Storage nodes allow for a better schematization of large, variable size structures such as pump stations or weirs. They are missing the functionality to connect them to the 2D mesh, so flooding from those locations is not visible. Adding the optio...
Marcel Glasbergen over 1 year ago in InfoWorks ICM / Ponds/Storage 1 Gathering support

Cavitation Check in Pumps & Valves

It is great that the software allows the definition of Control Valve curve to study the performance of the valve. However, it still needs to include the ability to define the cavitation curve (sigma or Xf) to check if the valve is cavitating or no...
Guest 23 days ago in InfoWorks WS Pro / Engine 0 For Review

InfoAsset Manager - Add more reports to Ruby Exchange method

Currently Ruby supports the following generation of reports:The Reports which are supported and generated via this method are: Manhole Report - ['cams_manhole',nil] Manhole Survey Report - ['cams_manhole_survey',nil] CCTV Survey Report - ['cams_cc...
Anthony Andrews 23 days ago in Info360 Asset / Reporting 0 For Review