Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks ICM

Showing 443

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest about 3 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Bank line ground model update from within properties view

Make update from ground model possible from within properties view (as is already possible for cross sections)
Guest about 3 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Adding Copy&Paste functionalities to the ICM UPM tool outputs

We would like to be able to easily copy paste the summarised results given by the UPM tool. We currently have to manually copy these results into excel which is prone to human error.
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Updating the water quality UPM tool to be compliant with the 3rd edition of the UPM manual for Level 1 water quality analysis.

Updating the water quality UPM tool to be compliant with the 3rd edition of the UPM manual for Level 1 water quality analysis. This includes: Removing the dependency of exceedances in a river on spill duration. This would provide a more robust app...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Set up runs more efficiently

Is there a matrix type tool in ICM that allows you to easily set up complicated run set ups? i.e. for this 1 Model Network, these runs with use these rainfall files, inflow files, WWG, etc are needed. Model Name Base Model Rainfall Inflow WWG...
Guest about 6 years ago in InfoWorks ICM / Productivity / Simulations 0 Gathering support

2D worst case analysis

I would like to be able to analyse a number of simulations in terms of the worst flood depth per 2D mesh element. An integrated tool (along the lines of the already existing worst case grid output) would avoid the need to mess around in external GIS.
Iain Scott about 5 years ago in InfoWorks ICM / 2D Flooding / Hydrology / Productivity 1 Gathering support

Add a "Pan to Selection" option in GeoPlan window

Just what the above says. The zoom in/out can be pretty touchy, particularly on track pad. While "zoom to selection" helps, if you're just trying to zoom to a single node or short link, it zooms in too close to be particularly helpful when looking...
Jacob Eck about 2 years ago in InfoWorks ICM / Visualization 1 Gathering support

Statistic Report Batch Processing

As a user the ability to 'schedule' statistical reports would be extremely useful. currently if i'm generating a spill report on several overflows for a 10yr TSR series this can take several hours. The process effectively locks the software and pr...
Jason Drake almost 6 years ago in InfoWorks ICM / Productivity / Results 4 Gathering support

Add simple percentage difference in calibration graphs

Add a simple percent error field between Overserved vs Model results (for min/max depth, flow, volume and velocity) in calibration graphs. Calibration targets are often presented as +- x%. Including a percent error field will make it much easier w...
Guest over 2 years ago in InfoWorks ICM / Calibration 0 Gathering support

'Find and Replace Flags' tool on multiple networks.

As a large organisation with multiple users of InfoWorks ICM we have a set up with one masterdatabase and everyone using groups off this in order to keep all users on the same version. The downside is, that as users import previous models more fla...
Tom Walker almost 6 years ago in InfoWorks ICM / Productivity 0 Gathering support