Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 659 of 1373

Improve model maintenance

As a user I want to be able automate my model build maintenance activity so that my hydraulic model always reflects the asset repository
Guest about 6 years ago in InfoWater Pro 1 Gathering support

SQL in run dialog box to select gauged objects

Using SQL to select gauged objects would allow their dynamic selection based on object properties, not just from a static list. This is an issue when testing scenarios if field names are added/changed. It is further compounded by selection lists b...
Guest almost 5 years ago in InfoWorks ICM / Productivity / SQL 0 Gathering support

ICM Template for printing muti-page Geoplan and Long Section views

I can already batch print geoplans and Long Sections by themselves. How to print them together? My current approach is to learn how to manipulate the output PDFs using PDF TK server, ghostscript, and potentially pdfjam, but some of these are new t...
Guest over 3 years ago in InfoWorks ICM / Long Section / Profile / Printing 1 Gathering support

Adjust VSP "Control Value" during model run with Basic Controls

Seems like a fundamental control to be able to adjust a pump's target flow rate dynamically, for a high/low flow setpoint based on tank levels or other triggers. I can currently adjust the speed setting in basic rules, but trying to hit a target f...
Eric King over 2 years ago in InfoWater Pro / Operational Modeling 2 Gathering support

Results tool tips for 2D Zone

Interactive tooltip appear to be missing 2D Zone element results...
Guest about 1 year ago in InfoWorks ICM / 2D Flooding 1 Under consideration

Insert polygon

Allowing this option to insert a polygon shape will be beneficial. avoid wasting time to draw a perfect boundary free hand. Basic shapes like circle, rectangle / square can be added.
Guest over 2 years ago in InfoWorks ICM / GIS Layers 2 Gathering support

Schedule Jobs - remove Any computer

Ability to remove 'Any Computer' option from Schedule jobs window.
Guest over 3 years ago in InfoWorks ICM / Productivity / Simulations 1 Gathering support

Detention Time Modelling

We would like the model to calculate detention time of sewer in a simulation. The idea is similar to water age calculation in WS. The aim is to use this as a proxy for odour study, in essence we would like to be able to create thematic maps to sho...
Guest about 5 years ago in InfoWorks ICM / Reporting / Results / Wastewater 0 Gathering support

Limit InfoWater Pro Results Output for External Applications to Certain Runs

Currently, when using the "EXT_APP_FILTER" setting to output results in .dbf format for selected elements, .dbf files are created for every single scenario that is run, although the .dbf output files might not be needed for all scenarios. This unn...
Christene Razafimaharo over 2 years ago in InfoWater Pro / Productivity 0 Gathering support

As an organisation we would like to export the data exposed in show details view

As an organisation we would like to export the data exposed in show details view in order to assist with reporting in relation disc storage/ utilisation i.e. ID associated with Model Group. We store all our DAP models within a single Db so collec...
Richard Robinson about 5 years ago in InfoWorks ICM / Export Data / Workgroup 0 Gathering support