Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 778 of 1374

Consolidate Mesh Report in Product

While the meshing report for clip meshing has improved, it still provides a lot of debugging information mixed with creation data, and limited summary of the mesh. Please consider the following to facilitate model reviews. Summary Section (current...
Guest about 2 years ago in InfoWorks ICM / Mesh 1 Gathering support

Statistical Analysis of ARR Temporal Pattern Ensembles should be enabled

Infoworks ICM should aim to facilitate statistical analysis of temporal pattern ensembles of ARR with a single click. Easily accessing and reviewing the statistical parameters for the required temporal pattern ensembles will allow Australian users...
Guest over 1 year ago in InfoWorks ICM / Results 0 Gathering support

Change upstream pipe connections

The ability to reassign the upstream component of a connection would be so useful. You can bulk import stormwater features and connections from AutoCAD but InfoDrainage does not seem to recognise when the connection is from the stormwater feature ...
Chloe Spencer about 1 year ago in InfoDrainage / Other 0 For Review

Slot Width field for 1D conduits

Could the Slot Width field be enabled for Conduit Type "Conduit" and results generated by the application of the numerical correction tool been stored there for greater clarity, thanks.
Giorgio Incelli almost 3 years ago in InfoWorks ICM / Hydraulics / Reporting 4 Gathering support

AutoCAD Civil 3D TIN Surfaces

I would like to import Autodesk Civil 3D TIN surfaces (including point clouds) into ICM as ground models without exporting to LandXML
Guest about 6 years ago in InfoWorks ICM / Import data / Terrain 2 Gathering support

Save and reuse PDM state variables in order to avoid long warmup

Before starting a hydraulic run, it is currently necessary to simulate long runoff-only runs in order to warm up the state variables of a PDM subcatchment, particularly soil moisture deficit. Would it be possible to impose initial state variables ...
Edith Maroy almost 3 years ago in InfoWorks ICM / Hydrology / PDM 0 Gathering support

Change coordinate system of a model more easily

We have a large project running for several years and our design team is working in one coordinate frame. Our clients models are all in another coordinate frame. Our team would like to reproject the models into the design coordinate frame but ther...
Guest over 4 years ago in InfoWorks ICM / Productivity 1 Gathering support

Ability to select multiple upstream traces at once

It would be useful to be able to hold ctrl / shift / alt or another keyboard link to be able to visualise multiple upstream traces at once. So after one trace has been selected, we could hold a key down and make another selection and retain all tr...
Lydia Crowther over 2 years ago in InfoWorks ICM / Network 0 Gathering support

Simulation Health Improvements

In certain instances, the suggestions provided in "Simulation Health: The results indicate flow continuity issues, even when the shortest time step is already selected in InfoDrainage" may not resolve the problem. This could be addressed by incorp...
Guest over 1 year ago in InfoDrainage / Hydraulics 1 In progress

Better hydraulic representation of flow in permeable paving

Flow through permeable paving does not occur as one would expect. Is greatly affected by the shape and direction the paving is drawn in InfoDrainage. When drawing an irregular shape the hydraulic grade lines appear incorrect, with flow all at one ...
Guest about 1 year ago in InfoDrainage / Hydraulics 0 For Review