Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks ICM

Showing 431

Bank line ground model update from within properties view

Make update from ground model possible from within properties view (as is already possible for cross sections)
Guest about 2 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Make Themes sharable between network types

An external IWS file stores a Network type, however, there are uniform Theming that can or should be shared - like Ground Models. Themes needs an overhall to share across models so we dont need to recreate the wheel or edit XML files to get things...
Matt Anderson over 1 year ago in InfoWorks ICM / Network 1 Gathering support

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body over 5 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support

Add support for nodes in Infoworks ICM "custom graph observed/predicted report" to compare water level

I would like to compare predicted(sim) and observed values at nodes for level. Currently the report only supports links, and the closest thing is the pipe depth at the node.
Mel Meng about 1 year ago in InfoWorks ICM / Reporting 0 Gathering support

Be able to create selection lists using ICM Exchange from a list of Node or link IDs

No description provided
Guest almost 5 years ago in InfoWorks ICM / API / Exchange / Productivity 1 Gathering support

Have all the functionality available in the 'Manage scenarios' dialogue in the ICM, to also be available via ICM Exchange

Options such as 'Reintegrate' & Duplicate'
Guest almost 5 years ago in InfoWorks ICM / API / Exchange 0 Gathering support

Bank line export for inline banks

If you export ICM results, the inline banks are now exported as the lines between the 2D outfall and the node that determines the 1D level. This is a meaningless object, whereas exporting the bank line geometry that is attached to it makes it much...
Marcel Glasbergen 7 months ago in InfoWorks ICM / Reporting 1 Gathering support

InfoWorks ICM needs to number 2D mesh elements using a Hexagon framework or similiar method if this is stormwater design tool of the future

A remesh in a scenario will move mesh element IDs all over the place rendering a new channel useless for design purposes. The maximum wsel equations makes the mesh look like a kalediscope. Uber uses Hexagons to subdivide the world, and I am sugges...
Matt Anderson 9 months ago in InfoWorks ICM / 2D Flooding 3 Gathering support

Adding Level 3/4 water quality processing to the ICM upm tool.

For future catchment studies, we are looking at completing higher levels of water quality impact assessment, Level 3/Level 4. For this we would like the UPM tool to be able to integrate ICM river models to represent river flows and river quality a...
Guest almost 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Add simple percentage difference in calibration graphs

Add a simple percent error field between Overserved vs Model results (for min/max depth, flow, volume and velocity) in calibration graphs. Calibration targets are often presented as +- x%. Including a percent error field will make it much easier w...
Guest almost 2 years ago in InfoWorks ICM / Calibration 0 Gathering support