Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 778 of 1375

Enable Data Flags for bed levels and roughness values in river section data

Enable data flagging for the bed level and roughness values within the river cross section data. This information was available in RS and is sorely missed.
Guest almost 6 years ago in InfoWorks ICM / Flags / River Modeling 0 Gathering support

Customization of Grid Windows in InfoWorks ICM

Allow custom grid window layouts in InfoWorks ICM, much like the Property window. Allow the user to reorganize the columns, change the column widths, or hide unnecessary columns, and save it as a layout to be applied as a default.
Dave White about 6 years ago in InfoWorks ICM / Grids 9 Gathering support

Allow underdrains to receive upstream flows from a pipe. Repair inflows to SuDS.

The SuDS nodes do not allow the inflows from an upstream pipe to connect directly to the underdrains. There are only options to connect them through no delays to subsurface areas (i.e. in bioretention nodes) or as a point inflow (i.e. filter drain...
Iwona Savas 11 months ago in InfoDrainage 0 For Review

Zoom (flexible) graphs once x-axis values set

When using flexible graphs (including obsevered predicted, etc) in ICM, there is the possibility to specify the x-axis extents (i.e. time and date) explicitly via the data dialogues. However, once I have specified them this way, the traditional zo...
Iain Scott 7 months ago in InfoWorks ICM / Results 0 Gathering support

Show preliminary sizing estimated flow depth in profile view.

The proportional depth is given in the Network Design Report but not shown in the long sections. This is a very useful feature to allow quick checking of throttling or spare capacity in the network.
Matthew Johnson about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Automatically clean completed items from Job Control window

When using InfoWorks ICM across a workgroup server, all the simulations are visible by all users in the job control window. To keep the list manageable this requires each individual user to remember to click remove completed jobs regularly. As lon...
Tom Walker over 1 year ago in InfoWorks ICM / Results 2 Already exists

Ability to add a customer line on a graph

It would be nice if you had the ability to add a line on to a graph at a specific interval on the axis. This would make it easier to visual if a specific level has been reached, for instance.
Alex Grist 7 months ago in InfoWorks ICM / Results 1 Gathering support

Fix EGL display in LS view

When displaying EGL lines in the long section view, EGL is frequently shown to increase across manholes in the downstream direction (and direction of flow). This should not occur as (excluding pumps) if energy was really is higher on the downstrea...
Haddon Smith 7 months ago in InfoWorks ICM / Visualization 2 Already exists

Enable flood "section view" without DEM and improve ground model representation

Would be nice if you could just the ICM "New section view" tool used for view flood results without a DEM loaded on to the screen - the tool is still useful with a DEM as can view the mesh level and flood level. Sometimes I want to use this tool b...
Haddon Smith 7 months ago in InfoWorks ICM / Visualization 1 Will not implement

Catchment area in different colour

currently the catchment area demarcation gives only a common colour at all area. we need to allow catchment area in different colors to demark Paved, unpaved, Road in details while we represent the details to client
Guest almost 2 years ago in InfoDrainage / Visualization 1 Gathering support