Validation as a background task

Validation as a background task so UI isn't locked.
Guest about 6 years ago in InfoWorks ICM / Productivity / Validation 2 Will not implement

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh about 6 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Ability to change mesh ground level values without remeshing

Mesh zones and Mesh level zones are available to change ground level values for the contained 2D meshes, but it will require re-meshing. If we can select 2D meshes by the polygon selection or selection tool and change the mesh elevation values wit...
Miyuki Okuda about 1 year ago in InfoWorks ICM / Mesh 1 Already exists

Change the way scenarios work

When scenarios were first introduced the way they were implemented didn't seem intuitive. With increasing interest in such as adaptive pathways the number of scenarios can rapidly increase because each scenario is its own network. This proposal is...
andy.bolden over 2 years ago in InfoWorks ICM / Scenario 0 Gathering support

Upstream and Downstream Trace Icons are misleading

Minor annoyance here and possible solution- can you change the icons for the upstream and downstream trace to actually be meaningful? at the moment both icons represent downstream and upstream trace at the same time and it doesn't make sense
Daniel Alexander 5 months ago in InfoWorks WS Pro / Other 1 Gathering support

Automated Data Exchange with InfoAsset Manager

If we think of asset management as divided into day-to-day work and organization (InfoAsset Manager) and long term, CIP planning work (Info360 Asset), this idea would bring asset management full circle. It'd also provide a huge workflow benefit fo...
Tim Medearis about 2 years ago in Info360 Asset / Integrations 3 Under consideration

Library of shared data across databases

As a large team with many databases, it is hard to manage a central set of SQL Queries, Themes, Inferences, Layer Lists, etc.We want a set of data like a Model Group that is shared among all databases in our cloud hub or workgroup server.
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Productivity 0 Gathering support

Create a stormwater system type

It would be useful to be able to manage stormwater networks separately from sewer
Brad Thompson over 2 years ago in Info360 Asset / Asset / Spatial Data Import 0 In progress

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body almost 6 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support

Allow underdrains to have a different slope to the SuDS feature

Allow a storage structure such as dry swale, bioretention area or infiltration trench to have a different slope to the underdrain. Currently the underdrain has to follow the slope of the feature, which is not a real life representation of how they...
Oliver Dodd about 1 year ago in InfoDrainage / Hydraulics 0 For Review