Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

When drawing infiltration trench, let me hold shift to invert which side of the trench i draw first

When drawing the trench, it is usally easier to draw the side along which im working against (IE a footpath edge) first, and then the width. Othewise i then have to rotate the object. Allow a user input by holding shift while drawing to allow user...
Guest over 3 years ago in InfoDrainage / Productivity 1 Already exists

Add username to temp folder names to allow multiple users to model on the same cloud computer at the same time

Could InfoWater/InfoSWMM change how they name temp folders? Right now, if two users initialize a model on the same cloud computer at the same time, both models might try to use the same temp folder (like HMVDB1). Renaming temp folders to include t...
Andrew Fugal almost 7 years ago in InfoWater Pro / Productivity 0 Will not implement

Split pipes using the InfoWater "Digitize Network" tool

The "Digitize Network" tool can be used to draw new pipes and junctions, but does not split existing pipes, even though you can snap to existing pipes and add a junction. This can cause confusion because it appears that the pipe has been split whe...
Colin Ricks almost 7 years ago in InfoWater Pro 1 Under consideration

Automatically autofit DB table column widths

No description provided
Colin Ricks almost 7 years ago in InfoWater Pro / Productivity 1 Gathering support

Reset the active facilities query without changing scenarios

When scenarios use a query set to define the active facilities, it would be useful to be able to re-run the query and update the active/inactive facilities without changing scenarios. Changing scenarios can be very slow for large models.
Colin Ricks almost 7 years ago in InfoWater Pro / Productivity 1 Will not implement

Zoom-dependent visibility of flow direction arrows

Flow direction arrows slow down the display significantly when zooming out on a large model. It would be useful to specify the scale at which they will be shown, similar to ArcMap layers.
Colin Ricks almost 7 years ago in InfoWater Pro / Productivity 1 Will not implement

Alert on river sections without having to make 1D results points

We'd like to create alerts on river sections without having to create either results points or having the reach split at the cross section in question
Richard Body almost 7 years ago in InfoWorks ICM / Live Modeling / River Modeling 0 Gathering support

Support polygon geometries in geoJSON imports

Support polygon geometries in geoJSON imports
Guest over 3 years ago in Info360 Asset / Asset / Spatial Data Import 1 Gathering support

Automate concurrent Fireflow simulations

When you integrate InfoWater into the InfoWorks platform, it would be great if you could ensure that FireFlow simulations can be scheduled and automatically run sequentially for different network scenarios. As far as I am aware this is not possibl...
Guest almost 7 years ago in InfoWater Pro / Engine 0 Gathering support

IWLive Pro to adopt simulation periods of ICMLive

Each simulation has a hindcast period, now and a forecast period
Guest almost 7 years ago in InfoWorks WS Pro 0 Gathering support