Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 868 of 1442

Ability to change mesh ground level values without remeshing

Mesh zones and Mesh level zones are available to change ground level values for the contained 2D meshes, but it will require re-meshing. If we can select 2D meshes by the polygon selection or selection tool and change the mesh elevation values wit...
Miyuki Okuda over 1 year ago in InfoWorks ICM / Mesh 1 Already exists

Support for ArcGIS Enterprise Portal (public)

Integrate with ArcGIS Enterprise Portal
Mike Maylone over 2 years ago in Info360 Asset / Esri 7 Under consideration

dark mode

for people that are spending a big amount of time in ICM, a dark mode would be ideal, don't know why this hasn't been implemented yet, since most of the apps have this option and there isn't really any option to change the appearence colours in th...
Ionut Pintea over 2 years ago in InfoWorks ICM / Visualization 2 Gathering support

Library of shared data across databases

As a large team with many databases, it is hard to manage a central set of SQL Queries, Themes, Inferences, Layer Lists, etc.We want a set of data like a Model Group that is shared among all databases in our cloud hub or workgroup server.
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Productivity 0 Gathering support

Optimise Head / Discharge curves automatically for simulations

When simulating models, it is often necessary to consolidate the values in a H/Q curve to retain the hydraulic performance but optimize the simulation speed. As during previous correspondence with the InfoWorks support team, this has been advised ...
Tom Walker almost 2 years ago in InfoWorks ICM / Orifice 2 Gathering support

Have all the functionality available in the 'Manage scenarios' dialogue in the ICM, to also be available via ICM Exchange

Options such as 'Reintegrate' & Duplicate'
Guest almost 6 years ago in InfoWorks ICM / API / Exchange 0 Gathering support

Graph RTC variables

RTC variables can be useful when modelling complex systems, but while I can check individual timestep values of variables using the log, it would be helpful to be able to visualize these on a graph (and compare it with other simulation results).
Iain Scott 11 months ago in InfoWorks ICM / Results 3 Gathering support

Pause simulations during server restarts

Please could we have an ability to auto-pause simulations whilst an InfoWorks ICM server is restarted? As part of the wider drive to reduce CSO spills there is an increasing need to run long time series through sewer models. This can require model...
Tom Walker about 3 years ago in InfoWorks ICM / Simulations 2 Gathering support

Adding Level 2 water quality capabilities to the ICM UPM tool

The current UPM tool only allows for completion of level 1 water quality impact assessments. We believe that our assessments would benefit greatly by having the additional functionality to complete level 2 water quality impact assessments. This me...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Increasing speed of UPM water quality tool

As part of SOAF, we are required to run CSO water quality analyses using 10-year simulations. Using these outputs in the UPM tool often takes a long time. Whilst the tool is running, the modeller cannot use ICM for completing other tasks. We have ...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support