Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 146

More user friendly management on toolbars

The standard position of the toolbars is all on top of each other. If you want to move a toolbar from its standard position, the compact toolbars turn into floating windows. Returning the toolbar back to its compact shape will also return the tool...
Hidde Galema over 2 years ago in InfoWorks WS Pro / Persona 2 Gathering support

Prevent tabs in Grid windows from always being hidden by scroll bar

The horizontal scroll bar at the bottom of the grid window occupies half the screen by default and needs to be constantly moved every time to access a common tab like pumps. Like EVERYTIME you close the window. It is actually a huge pain and shoul...
Casey Shannon over 2 years ago in InfoWorks WS Pro / Productivity 1 Gathering support

Hydrant and valve placement optimization

Hi there, We have been discussing the valve optimization in the whole County and if the InfoWater Pro can have the function to optimize the placements of hydrants and valves in the network to facilitate the design and high-level planning, that wou...
Guest over 2 years ago in InfoWater Pro / Productivity 1 Gathering support

New Feature is Active in All Scenarios Option (InfoWater/Pro)

Add a tools/options option so when you add new features they will be active in all scenarios, instead of getting errors 100 times for every scenario you try to run where the features were not included originally. This would be especially useful wh...
Guest about 5 years ago in InfoWater Pro / Productivity 0 Gathering support

Account for multi-connection properties during criticality analysis

Some hospitals for example have multiple service laterals connecting them to the network. If one line is cut off from service due to a repair, the hospital can still get water. As a result, criticality is overestimated when this logic is ignored. ...
Nathan Gerdts almost 3 years ago in InfoWater Pro / Other 0 Gathering support

Apply two-valve isolation for criticality analysis

For some projects we need to isolate the repair area with two closed valves in all directions in case one valve were to fail. Please incorporate this as an option in criticality analysis when summing affected customers
Nathan Gerdts almost 3 years ago in InfoWater Pro / Other 0 Gathering support

As a user of InfoWorks WS PRO, I would like to better simulate FMV valves

In InfoWorks WS PRO is possible to simulate FMV valves, but I would like to introduce a "deviation" option to better simulate it. I give an example: imagine a valve whose pressure setting is 2 Bar if flow is from 0 to 10 L/s, and 2.5 Bar if flow i...
Paolo Boiardi almost 3 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Copy all the scenarios from a Model

Impossible to make a subsystem copy of a model (with different scenarios) that brings all the scenarios to the new model when I make a copy of the selected nodes and links. At this moment, a copy only brings the current scenario.
Juan Carlos Ortega almost 3 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

The "join model" tool does not work correctly with Scenarios

The Infoworks Join Model Tool does not work correctly with Topologies and Controls containing different scenarios In the resulting united model, it maintains the four scenarios, but in all four scenarios the Topology and Control are the same, it r...
Juan Carlos Ortega almost 3 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Respect the text separators of the operating system used by the equipment.

Respect the text separators of the operating system used by the equipment.
Juan Carlos Ortega almost 3 years ago in InfoWorks WS Pro / Data Exchange 3 Gathering support