Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Option of splitting pipes/Polygons in InfoWorks WS Pro

Like the option available to split the polygons, if there is an option available that would be good. If we are able to automatically split the pipe into many segments automatically using an automated option like the feature available in ICM to ge...
Guest over 6 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Optional channel to river reachs option

The way ICM identifies the centre-line of the river reach is by using the point with the lowest invert level. Regardless of the shape of the channels of how much is the value of the X coordinate, didn't affect the appearance of the section to gene...
Liu Qiusheng over 6 years ago in InfoWorks ICM / Network / River Modeling 0 Gathering support

Auto-space custom labels

We use custom labels a lot in reporting how we model ancillaries, and for complex assets spend a long time adjusting labels so they don't overlap and do show up properly. It would be great if a more "smart" label engine could be used so that label...
Oliver Perkins over 6 years ago in InfoWorks ICM / Labels / Visualization 0 Gathering support

Visibility by system type

It would be usefull to have the possibility to easily switch on and off the layers of different system types by ticking on and of the different types/layers in the Geoplan Layers and Themes. By using the themes and adding visibility it is possib...
Richard Wilbrink about 4 years ago in InfoWorks ICM / GIS Layers 3 Gathering support

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest over 6 years ago in InfoWorks WS Pro / Operations 0 Gathering support

Create selection list from level or inflow events

In some of our older or larger models the number of profiles in level or inflow events have grown to > 100. Through the time quite a number of these have become obsolete because of consecutive model updates (resulting in many log warnings), but...
Guest over 6 years ago in InfoWorks ICM / Events / Productivity 0 Gathering support

Infoworks ICM - 12d import

Import 12d tin files, both surface and network model files.
Guest over 6 years ago in InfoWorks ICM / Terrain 0 Gathering support

Refine selection to include subcatchments draining to multiple links or other subcatchments

Subcatchments draining to a single link can already be added to an existing selection of node and links by using the refine option, if the upstream node of that link is selected. It would be interesting to have a similar extension for subcatchment...
Guest over 6 years ago in InfoWorks ICM / Hydrology / Reporting 0 Gathering support

Add filters to inspection charts

The charts tool, when viewing PACP inspections, currently shows the distribution of scores only. For reporting purposes, it would be nice if some additional parameters could be added. For example, seeing the score distribution across pipe or inspe...
Kim Solberg about 2 years ago in Info360 Asset / Map visualization 1 Under consideration

Reference risk and rehab results in risk model

Proposing increasing risk component types to include results from other risk models and rehab plans. Ideally, it would function similarly to the Pipe Inventory option within IAP that would allow you to select any table within the project database....
Kim Solberg about 2 years ago in Info360 Asset / COF & LOF Categories / Components 1 Gathering support