Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Results tool tips for 2D Zone

Interactive tooltip appear to be missing 2D Zone element results...
Guest almost 2 years ago in InfoWorks ICM / 2D Flooding 1 Under consideration

Scenario assigned 'official' ID numbers within software

I would like for scenario names to be prefixed with a built-in ID number, in the same way that model commits have official version numbers, and wastewater and trade waste profiles have ID numbers. ICM clearly tracks ID numbers behind the scenes, s...
Jason Kulsdom almost 4 years ago in InfoWorks ICM / Scenario 1 Gathering support

Ability to resize node layers in the map.

This is a spatial symbology enhancement to what has already been implemented. Alter the node size in the theme tool
Guest almost 4 years ago in Info360 Asset / Customization / Styling / Layer Panel 0 Gathering support

Option to pan through 2 or multiple geoplans at the same time

Sometimes (in ICM and IAM) in comparing 2 (or more) networks visually the networks are most of the time tiled horizontally of vertically. But when panning through one network, it would be very convenient that the other network(s) is/are also movin...
Guest over 5 years ago in InfoWorks ICM / Productivity 0 Gathering support

Integrate w/Infor EAM

Specifically for City of Portland and City of Houston, would like to be able to integrate their data being collected in Infor including work order information.
Mike Maylone almost 6 years ago in Info360 Asset / Other 1 Gathering support

Report InfoSWMM available capacity against theoretical flow for specified d/D

InfoSWMM provides Pipe/Conduit summary report with values for Max flow divided by "Full Flow". Here the "full flow" is based on Manning's equation for when the pipe is full. However as a sewer utility, we're not allowed to fill pipes. We must keep...
Guest almost 6 years ago in InfoWorks ICM / Grids / Reporting 2 Gathering support

Active/Inactive Network Elements

Ability to activate and inactivate model elements in InfoWorks as one can do in InfoSWMM.
Michael Wetterau almost 4 years ago in InfoWorks ICM / Productivity 0 Gathering support

Add Data Sets to InfoWorks

Add Data Sets to InfoWorks as one can do in InfoSWMM. Helpful when clients want to model alternatives scenarios and make last minute changes.
Michael Wetterau almost 4 years ago in InfoWorks ICM / Productivity 0 Gathering support

Print Tickbox for Manhole Schedule Layout option

In MicroDrainage 2019.1 the Manhole Schedule printout also includes a manhole layout, sometimes this is unnecessary and it would be helpful if there was an additional tickbox option in the printout settings.
Guest almost 4 years ago in InfoDrainage 0 Gathering support

Allow SOIL values < 0.15

The Rural Runoff estimate tool in MDSUDS does not allow values of SOIL below 0.15. The UKSUDS greenfield runoff tool defaults to a value of SOIL=0.1 where SoilType=1 This produces a significant difference in results. This difference results from u...
Guest almost 4 years ago in InfoDrainage 0 Gathering support