Sort and collapse all option in flowpath Network Design Report

It would be useful to be able to ‘collapse all’ for branches in the Network Design Report. It would also be useful to be able to sort the connections (and junctions) in order of upstream→downstream or alpha/numeric. At the moment it seems rather a...
Matthew Johnson over 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Data Exchange for Revit

It would be useful to provide a seamless data exchange with other Autodesk products rather than just C3D - specifically Revit. On an architectural scale project, we often dont use a package like Civil 3D so being able to carry out drainage design ...
matthew.piggott 8 months ago in InfoDrainage / Data Exchange 0 For Review

Liquid filled/Flooded drainage network

Liquid filled/Flooded drainage network- the system should be required to design flooded drainage network i.e. drainage pipe should be always filled with liquid for entire length up to the discharge point. Like a surcharge up to manhole cover (liqu...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Totalizer Valve and Controls

It would be very useful to have a totalizer valve which closes after a certain amount of flow passes through over a given time, such as 5 MGD over a day, then reopens once that time period has passed. Alternatively, a control option based on a pip...
Guest over 1 year ago in InfoWater Pro / Operational Modeling 2 Under consideration

Multiple return period hydrograph

Currently, InfoDrainage restricts each hydrograph to a single return period, which creates inefficiencies when analyzing stormwater systems across multiple design storms. To accommodate analyses for 2-, 10-, and 100-year events, for example, users...
Guest 11 months ago in InfoDrainage / Hydrology 0 For Review

Modelling intermediate check dams and weirs in open channels including ponds ands swales

Currently, InfoDrainage only allows modeling of check dams or weirs at outlets. For open channels with multiple intermediate check dams, users must split the channel into sections, each with its own outfall defined. A more accurate feature allowin...
Dilraj KT over 2 years ago in InfoDrainage / Hydraulics 1 Gathering support

Make Scenario Explorer window panes resizable to see long Data Set names

When you resize the Scenario Explorer window, the left side with the Scenarios gets larger but the right side with Data Set / Facility / General tabs does not widen, so you can't see long Data Set names without opening a separate window.
Grant Clemens over 1 year ago in InfoWater Pro / Productivity 0 Gathering support

Button: Apply to all phases

To each of the build screens, next to "apply", add another button, "apply to all phases". This would save a lot of time when making tweaks to models for which more than one phase is being run (which is most models)
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Provide Enhanced Manhole Schedule Details

It would be great to have the option of providing an additional level of customisable detail which could be configured on MH Schedules. As an example including practical details around the cover – contractors want to know and see more from a MH s...
Guest over 3 years ago in InfoDrainage 1 Gathering support

Pipe clash detection when foul network phase is active

When working through clashes between surface water and foul networks, you can only access the pipe clash analysis within surface water analysis tab. This means if I want to change the depth of the foul network to avoid the clash then I have to swa...
Henry Wilkinson 11 months ago in InfoDrainage / Productivity 1 For Review