Showing 550 of 1370

Validation as a background task

Validation as a background task so UI isn't locked.
Guest about 6 years ago in InfoWorks ICM / Productivity / Validation 2 Will not implement

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh about 6 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Ability to change mesh ground level values without remeshing

Mesh zones and Mesh level zones are available to change ground level values for the contained 2D meshes, but it will require re-meshing. If we can select 2D meshes by the polygon selection or selection tool and change the mesh elevation values wit...
Miyuki Okuda about 1 year ago in InfoWorks ICM / Mesh 1 Already exists

Change the way scenarios work

When scenarios were first introduced the way they were implemented didn't seem intuitive. With increasing interest in such as adaptive pathways the number of scenarios can rapidly increase because each scenario is its own network. This proposal is...
andy.bolden over 2 years ago in InfoWorks ICM / Scenario 0 Gathering support

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body almost 6 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support

Commit history for scenarios

Commit history for scenarios Show an extra column in the commit history window to indicate how many scenarios exist in this version of the network. Ideally, there would be a button or column through which you can see the names of the scenarios for...
Annemie Vermeulen about 3 years ago in InfoWorks ICM / Scenario 1 Gathering support

Show individual vertex points in the geoplan at all zooms

Vertices are only shown in the geoplan when zoomed in. It would be useful to see these at all zoom levels for cross sections and bank lines.
Guest almost 3 years ago in InfoWorks ICM / Productivity 0 Gathering support

Graph RTC variables

RTC variables can be useful when modelling complex systems, but while I can check individual timestep values of variables using the log, it would be helpful to be able to visualize these on a graph (and compare it with other simulation results).
Iain Scott 7 months ago in InfoWorks ICM / Results 3 Gathering support

Optimise Head / Discharge curves automatically for simulations

When simulating models, it is often necessary to consolidate the values in a H/Q curve to retain the hydraulic performance but optimize the simulation speed. As during previous correspondence with the InfoWorks support team, this has been advised ...
Tom Walker over 1 year ago in InfoWorks ICM / Orifice 2 Gathering support

Asymmetrical Tanks

Currently ICM treats storage areas where there is a change in area at a certain level as symmetrical. This limits hydraulic modelling by constraining the structures that can be built. An option to account for asymmetry would be useful ( similar to...
Guest 4 months ago in InfoWorks ICM / Ponds/Storage 1 Will not implement