Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 169 of 1370

Dark theme for InfoWorks

I prefer working from a dark theme to reduce eye strain while working in models multiple hours day.
Nathan Gerdts about 2 years ago in InfoWorks WS Pro / Other 0 Gathering support

Comparing the inputs of two runs

When I have two runs, I can compare the results of both of them. But for some cased I would need to compare the parameters or simulation options. This would be similar to comparing two versions of network database but its focusing globally on the ...
Guest about 1 month ago in InfoWorks WS Pro / Productivity 2 Gathering support

Moving multiple nodes and links simultaneously

The “Move Nodes” option under GeoPlan > Geo Plan tools does not seem to allow for the moving of multiple nodes simultaneously. Additionally, having an option to move selected objects in one go would be very helpful, allowing a user to move grou...
Guest 8 months ago in InfoWorks WS Pro / Productivity 1 Gathering support

Display critical results for indvidual elements

With the variability of design rainfall patterns, critical hydraulic results (mean/median/min/max) often occur at different rainfall durations for different elements (eg specific pipe/MH/channel/etc) within a network for the same rainfall event pr...
matthew.piggott about 1 year ago in InfoWorks ICM / Results 2 Already exists

Improve database and results files read performance

When opening an ICM network for the first time (i.e. no network files in the local files "Working" folder), the WDS reads through the database file in 4 kB chunks to retrieve the requested version of the network. This read process appears to be li...
Peter Dunlop almost 4 years ago in InfoWorks ICM / Performance / Results 3 Gathering support

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh about 6 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Upstream and Downstream Trace Icons are misleading

Minor annoyance here and possible solution- can you change the icons for the upstream and downstream trace to actually be meaningful? at the moment both icons represent downstream and upstream trace at the same time and it doesn't make sense
Daniel Alexander 5 months ago in InfoWorks WS Pro / Other 1 Gathering support

Library of shared data across databases

As a large team with many databases, it is hard to manage a central set of SQL Queries, Themes, Inferences, Layer Lists, etc.We want a set of data like a Model Group that is shared among all databases in our cloud hub or workgroup server.
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Productivity 0 Gathering support

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body almost 6 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support

Graph RTC variables

RTC variables can be useful when modelling complex systems, but while I can check individual timestep values of variables using the log, it would be helpful to be able to visualize these on a graph (and compare it with other simulation results).
Iain Scott 7 months ago in InfoWorks ICM / Results 3 Gathering support