Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1387 of 1387

Show water levels at Bridge Linear Structures

We would like to see the water levels at the bridge linear structures as it is important for us to be able to see the water levels with respect to the bridge openings and decks.
Richard Body about 5 years ago in InfoWorks ICM / Bridge / Hydraulics / Results 0 Gathering support

Better Video Encoders

The AVI recorder uses a Windows 11 unknown CODEC - update the video encoder to something modern!
Guest over 1 year ago in InfoWorks ICM / Performance 1 Under consideration

Add Vertex Workflow

The Edit Geometry Workflow for adding, and editting vertex is fragile. Inserting a vertex breaks the linear aspect of the 2D boundary as InfoWorks does not provide any feedback. Autodesk workflows in Civil 3D, InfraWorks, and Revit provide user fe...
Guest about 2 years ago in InfoWorks ICM / Mesh 0 Gathering support

Include the volume of the downstram manhole ONLY if selected

Change behaviour of Storage Operations: Calculate total storage... function. The current behaviour is unintuitive and incorrect.
Guest over 1 year ago in InfoWorks ICM / Network 3 Under consideration

2D Result Long Profile results comparison

When doing flood study, XPSWMM had a cross-section tool that would show WSEL. While I can use US/DS profiles to compare two scenarions - I want to cut a long section along a 2D channel (and no I am not converting it to River Sections as it defeats...
Guest over 1 year ago in InfoWorks ICM / 2D Flooding 1 Gathering support

Validation of Bridge data

When a model is validated, it doesn't pick up on problems with bridges, that prevent the model from running. For example, the error "bed section is above soffit" is given when trying to run the model, but does not appear in the validation messages...
Guest about 5 years ago in InfoWorks ICM / Bridge / River Modeling / Validation 0 Gathering support

Provide option to allow for several multipliers and use with selection sets

In addition to a global multiplier, sometimes you want to peak certain areas and selection sets with specific peaking factors. WaterCAD allows for this under their calculation options.
Michele Marston over 1 year ago in InfoWater Pro / Operational Modeling 0 Gathering support

InfoAsset Online - Add Head Discharge Grid and Graph

This appears to be missing in IAO yet it is present in IAM. It is needed in IAO.
Jim O'Dowd about 2 years ago in Other Product Ideas / Asset Management 0 For Review

Option to compare Simulations of different time ranges superimposed on one graph [IWLive]

As an operator, I want to compare today's forecasted operations with different days in the past so I can see alternative ways how similar situations played out and make decisions with confidence. IWLive already offers functionality to compare two ...
Nathan Gerdts 9 months ago in InfoWorks WS Pro / Operations 0 For Review

roll back commit history

We can see what the commit history is, but if you made a mistake and committed it there's no way to go back without making a new branch. Would be good to be able to roll back changes to a selected point in the commit history so your mistake isn't...
Ben Davies over 3 years ago in InfoWorks WS Pro 1 Gathering support